GrantedInfrastructureDecided 8 October 2025

Between the existing Cahir Substation in the townland of Ballyhenebery Co. Tipperary, and Knockraha Substation in the townland Ballynanelagh Co. Cork, (full townland list provided in PECR)

Refurbishment of 24.3 km of overhead power lines and support structures between Cahir and Knockraha.

2461133 · Tipperary County Council · Lodged 20 December 2024

Reference
2461133
Authority
Tipperary County Council
Register status
Decided
Type
PERMISSION
Received
20 December 2024

Summary

AI-generated

The development consists of refurbishment works to 24.3 km of overhead line, including the replacement of wires, 5 towers, and 35 polesets. The works span multiple townlands in County Tipperary and include the installation of three temporary construction compounds.

Infrastructuregridelectricityinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Refurbishment works to 24.3 km of overhead line, 9 no. Steel towers and 121 no. Wooden polesets within county tipperary. These lie between the existing cahir substation in the townland of ballyhenebery, and the border with county cork in the townland of coolapreavan, crossing the county tipperary townlands of: ballyhenebery, monaraha, ballymacadam west, killeenbutler, garnavilla, ballybrada, cranna, roosca (hickey), roosca (burke), crannavone, killinure, ballyhohan, ballygarrane, derravoher, burges west, curraghatoor, kilroe, kilbeg, inchnamuck, ballysheehan, shanbally, knockaarum, cullenagh south, carriganroe, coolantallagh, carrigavisteal, dangan, cooladerry, knocknagapple and coolapreavan. The development also includes 3 no. Temporary construction compounds in the townlands of killeigh, garnavilla and knockaarum. The works in county tipperary will consist of: the replacement (“restringing”) of the existing overhead line (ohl) circuit conductor wires; replacement of 5 no. Towers and 35 no. Polesets with similar dimensions and heights as the existing; installation of replacement parts on towers and polesets; foundation refurbishment / strengthening and recapping / clearing of shear blocks; all associated site development works, including temporary works areas; clearance of shear block bases; vegetation maintenance works; ancillary site preparation works, site clearance and levelling at the 3 no. Temporary construction compounds, temporary works to existing tracks and new temporary access routes to each structure; and all associated works required to facilitate the proposed development. A natura impact statement (nis) will be submitted to the planning authority with the application

Key dates

Timeline

  1. Application received20 December 2024
  2. Further information requested21 February 2025
  3. Further information received15 August 2025
  4. Decision due9 October 2025
  5. Decision issued8 October 2025
  6. Appeal submitted21 October 2025
  7. Appeal decided4 March 2026
  8. Permission expiry3 March 2031

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.