GrantedInfrastructureDecided 2 December 2024

Meelick Money Upper Rathleague Hophall Ballymooney Money Lower Dysart Lamberton Demesne Derry Clonminam Powelstown Kylekiproe and Cappoley and Esker., Co. Laois, N/A

Refurbishment of 43 electricity transmission towers along a 7.3 km section of overhead line.

2460593 · Laois County Council · Lodged 8 October 2024

Reference
2460593
Authority
Laois County Council
Register status
Decided
Type
PERMISSION
Received
8 October 2024

Summary

AI-generated

The development consists of refurbishment works to the Coolnabacky to Portlaoise 110 kV overhead line. Works include restringing conductor wires, installing a new fibre communication connection, strengthening foundations, and replacing 26 wooden polesets with some height increases.

Infrastructureelectricityinfrastructuregrid

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Refurbish existing 43 no. Electricity transmission towers along a c. 7.3 km section (length) of the coolnabacky – portlaoise 110 kv overhead line (ohl). The total area to which the application relates is c. 37 hectares. The development will consist of refurbishment works to the ohl. Refurbishment works will vary from each of the existing 43 no. Existing electricity transmission towers and will comprise: (i) replacement (“restringing”) of the existing overhead line conductor wires with a higher capacity conductor; (ii) installation of a new fibre communication connection between existing wooden intermediate poleset (imp) 118 to existing angle mast (am) 145; (iii) strengthening of 4 no. Existing ams and associated foundations; (iv) replacement of 26 of the 37 no. Existing imps with similar structures, except for existing imp105 to be upgraded to am (am105). Replacements will be in situ or if required, immediately adjacent, and height will range from c. 0m to 2.7m higher, with no change in height in 19 no. Existing imps and a maximal increase of c. 2.7m at existing imp127; (v) replacement of 1 no. Am (am145) with a line cable interface mast (lcim) and removal of 1 no. Am (am146); (vi) replacement of crossarms at 12 no. Existing imps; (vii) replacement of insulating and ancillary hardware at structures; (viii) all associated site development works along the overhead line including vegetation clearance and management, disassembly and reassembly of gate posts/piers and removal and reinstatement of existing fencing, painting, installation of identification and information labels/notices, and ancillary works within the existing portlaoise substation, necessary to facilitate the refurbishment works of the overhead line; and, (ix) other temporary associated and ancillary site development works required for the proposed refurbishment works including the provision of a construction compound located at either kylekiproe or esker, access routes, silt traps, silt fences, stone tracks, ground protection mats, infrastructure crossing support systems (e. G. , guard poles and goal posts) and temporary watercourse crossings. Where required, an aerial catenary stringing system (acss) will be used to facilitate stringing operations over major obstacles (e. G. , national roads, rivers, etc. ). The planning application will be accompanied by a natura impact statement.

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Newtown, Durrow, LaoisFeb 2025€450,00013 m
Dereen, Durrow, PortlaoiseNov 2025€442,000380 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 October 2024
  2. Decision due2 December 2024
  3. Decision issued2 December 2024
  4. Appeal submitted6 January 2025
  5. Appeal decided23 May 2025
  6. Permission expiry22 May 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.