Planning Permission Ireland
Awaiting decisionEnergy

Thornhill and Annaholty, Birdhill, Co Tipperary

Construction of a biogas renewable energy facility in Birdhill.

2560984 · Tipperary County Council · Lodged 2 October 2025

Reference
2560984
Authority
Tipperary County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
2 October 2025

Summary

AI-generated

A 10-year permission is sought for a biogas renewable energy facility. The development includes anaerobic digesters, storage tanks, a feedstock reception hall, silage clamps, and associated infrastructure.

Energybiogasrenewable energyinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A period of 10 years for the construction and operation of a biogas renewable energy facility comprising of 2 no. Primary anaerobic digesters (height c. 18.5m); 1 no. Secondary digester/storage tank (dome height c. 16.5m); 1 no. Digestate storage tank (dome height c. 16.5m); 2 no. Manure reception tanks (dome height c. 12m); 1 no. Desulphurisation unit (ground floor area (gfa) c. 13m2, height c. 3.3m), 1 small tank (height c. 3.2m) and 2 larger tanks (height c 9.8m & c 11.8m); 2 no. Pasteurization tanks (height c. 5.6m) and 2 no. Cooling tanks (height c. 5.6m); 1 no. External solid input device (sid); 1 no. Pump room (gfa 300m2, height 3.1m); these components will be located within a containment bund (height c. 1.5m). The proposed development will also consist of: 1 no. Feedstock reception hall (gfa 1,800m2, height c. 15m) with air filtration unit (stack height c. 20.5m), 1 no. Underground mixing tank (diameter c. 16m, height c. 4m), 1 no. Sid, offices, and workshop; 5 no. Silage clamps (gfa 8,640m2, height c. 5m); 1 no. Storage shed (gfa 228m2, height c. 5m); 1 no. Rainwater harvesting tank (height c. 6m); 1 no. Fire water storage tank (height c. 5.5m); 1 no. Plant room (gfa c. 90m2, height c. 5.3m); 2 no. Chp units and chillers (gfa 44m2 each, maximum height c. 7.5m to flue); 1 no. Bunded biofuel tank (length c. 6.2m, height c. 2.3m); and diesel tank (length c. 4m, height 2.5m); 1 no. Dewatering storage building (gfa c. 263m2, height c. 5.5m) with air filtration unit (stack height c. 9.5m); 1 no. Esb substation building (gfa c. 65m2, height c. 3.8m); 1 no. Biomethane upgrade unit (gfa c. 235m2; height c. 13.2m); 1 no. Carbon dioxide capture unit (gfa c. 885m2, height c. 16.7m); 1 no. Two storey admin building containing offices, laboratories, and welfare facilities (gfa 228m2, height c. 8.2m); 1 no lpg compound (gfa 98m2) with bunded wall (height c. 2.5m) containing 2 no. Propane tanks (diameter c. 1.5m, length c. 4.8m); 1 no. Emergency flare (height c. 7.7m); 1 no. Gas networks ireland (‘gni’) compound (‘biomethane network entry facility’) kiosk (gfa c. 24m2, height c. 5.1m (antenna)); firewater retention pond (c. 1,750m3); infiltration basin (c. 2300m3); underground silage clamp tank, (c. 3,725m3), boundary treatments and ancillary works that will include: tree felling to facilitate construction and operation of the proposed development; new site entrance off the l94451, security gates

Key dates

Timeline

  1. Application received2 October 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.