Thornhill and Annaholty, Birdhill, Co Tipperary
Construction of a major biogas renewable energy facility with anaerobic digesters.
2561056 · Tipperary County Council · Lodged 21 October 2025
- Reference
- 2561056
- Authority
- Tipperary County Council
- Register status
- Invalid or incomplete
- Type
- PERMISSION
- Received
- 21 October 2025
Summary
AI-generatedThe proposal seeks a 10-year permission for a biogas renewable energy facility. It will feature two primary anaerobic digesters, secondary and digestate storage tanks, manure reception tanks, a feedstock reception hall, silage clamps, and associated plant infrastructure.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Red iii a period of 10 years for the construction and operation of a biogas renewable energy facility comprising of 2 no. Primary anaerobic digesters (height c. 18.5m); 1 no. Secondary digester/storage tank (dome height c. 16.5m); 1 no. Digestate storage tank (dome height c. 16.5m); 2 no. Manure reception tanks (dome height c. 12m); 1 no. Desulphurisation unit (ground floor area (gfa) c. 13m2, height c. 3.3m), 1 small tank (height c. 3.2m) and 2 larger tanks (height c 9.8m & c 11.8m); 2 no. Pasteurization tanks (height c. 5.6m) and 2 no. Cooling tanks (height c. 5.6m); 1 no. External solid input device (sid); 1 no. Pump room (gfa 300m2, height 3.1m); these components will be located within a containment bund (height c. 1.5m). The proposed development will also consist of: 1 no. Feedstock reception hall (gfa 1,800m2, height c. 15m) with air filtration unit (stack height c. 20.5m), 1 no. Underground mixing tank (diameter c. 16m, height c. 4m), 1 no. Sid, offices, and workshop; 5 no. Silage clamps (gfa 8,640m2, height c. 5m); 1 no. Storage shed (gfa 228m2, height c. 5m); 1 no. Rainwater harvesting tank (height c. 6m); 1 no. Fire water storage tank (height c. 5.5m); 1 no. Plant room (gfa c. 90m2, height c. 5.3m); 2 no. Chp units and chillers (gfa 44m2 each, maximum height c. 7.5m to flue); 1 no. Bunded biofuel tank (length c. 6.2m, height c. 2.3m); and diesel tank (length c. 4m, height 2.5m); 1 no. Dewatering storage building (gfa c. 263m2, height c. 5.5m) with air filtration unit (stack height c. 9.5m); 1 no. Esb substation building (gfa c. 65m2, height c. 3.8m); 1 no. Biomethane upgrade unit (gfa c. 235m2; height c. 13.2m); 1 no. Carbon dioxide capture unit (gfa c. 885m2, height c. 16.7m); 1 no. Two storey admin building containing offices, laboratories, and welfare facilities (gfa 228m2, height c. 8.2m); 1 no lpg compound (gfa 98m2) with bunded wall (height c. 2.5m) containing 2 no. Propane tanks (diameter c. 1.5m, length c. 4.8m); 1 no. Emergency flare (height c. 7.7m); 1 no. Gas networks ireland (‘gni’) compound (‘biomethane network entry facility’) kiosk (gfa c. 24m2, height c. 5.1m (antenna)); firewater retention pond (c. 1,750m3); infiltration basin (c. 2300m3); underground silage clamp tank, (c. 3,725m3), boundary treatments and ancillary works that will include: tree felling to facilitate construction and operation of the proposed development; new site entrance off the l94451, security gates and fencing; access roads and yards; 1 no. Weighbridge; 2
Key dates
Timeline
- Application received21 October 2025
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Awaiting decisionAt this site
RED III development which will consist of planning permission for a period of 10 years for the construction…
Thornhill and Annaholty , Birdhill , Co. Tipperary
2660621TipperaryLodged 25 Jun 2026
- Awaiting decision300 m away
A period of 10 years for the construction and operation of a biogas renewable energy facility comprising of 2…
Thornhill and Annaholty , Birdhill , Co Tipperary
2560984TipperaryLodged 2 Oct 2025Energy
- Granted360 m away
The demolition of an existing dwelling & construction of a replacement dwelling, separate shed/store, removal…
Annaholty , Birdhill , Co. Tipperary
2260635TipperaryLodged 18 Nov 2022Demolition
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decision
RED III development which will consist of planning permission for a period of 10 years for the construction…
Thornhill and Annaholty , Birdhill , Co. Tipperary
2660621TipperaryLodged 25 Jun 2026
- Awaiting decisionEnergy
RED III application for development which comprises the construction of an anaerobic digestion facility to…
Ballynilard , Tipperary , Co. Tipperary
2660031TipperaryLodged 19 Jan 2026
- Awaiting decisionEnergy
A period of 10 years for the construction and operation of a biogas renewable energy facility comprising of 2…
Thornhill and Annaholty , Birdhill , Co Tipperary
2560984TipperaryLodged 2 Oct 2025
- RefusedEnergy
For the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be…
Ballyvass , Castledermot , Co. Kildare
2560920KildareLodged 12 Aug 2025
- RefusedEnergy
The construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be…
Cappanihane , Bruree , Co. Limerick
2560239LimerickLodged 24 Mar 2025
- GrantedEnergy
Permission for the proposed development will consist of the completion of the Renewable Biogas Plant as…
Inchera Little Island Co.Cork
25/5034corkLodged 3 Jun 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.