Planning register
Cahir
Planning applications inside the Cahir, Co. Tipperary settlement, as recorded on the statutory register. The area is the CSO’s Census 2022 urban boundary.
- Applications
- 187
- County
- Tipperary
Planning intelligence
Grant rate
95%
of 137 applications granted, refused or part-granted since 2016.
- Granted
- 130
- Refused
- 7
- No decision recorded
- 50
Historical outcomes from the statutory register. Not a prediction for any individual application.
What’s being built
- Extension
- 22%
- Retention
- 18%
- Alterations
- 14%
- Commercial
- 11%
- Change of use
- 8%
- Infrastructure
- 8%
Activity over time
Applications lodged, by year
Grant rate, by year of decision
Recently lodged in Cahir
- Awaiting decision
A) the use of the existing club house as a childcare facility and, b) RETENTION PERMISSION for the extension…
Cahir GAA Club , Saint Marys Road , Cahir Co. Tipperary
2660637TipperaryLodged 1 Jul 2026
- Awaiting decision
The construction of an extension (pedestrian elevator area) to the front elevation of the service station…
Mitchelstown Road , Carrigeen , Cahir Co. Tipperary
2660617TipperaryLodged 24 Jun 2026
- Granted
A Sunroom extension to existing dwelling house
No. 17 The Avenue Woodlands , Barnora Cahir , Co. Tipperary
2660292TipperaryLodged 2 Apr 2026
- Awaiting decision
A sunroom extension to existing dwelling house
No. 17 The Avenue Woodlands , Barnora Cahir , Co. Tipperary
2660280TipperaryLodged 31 Mar 2026
- Awaiting decision
The development which will consist of the partial removal of Bakery Weir and the non-functional fish pass to…
Bakery Weir , River Suir in the townlands of Barnora & Caherabbey Lower , Co. Tipperary
2660147TipperaryLodged 20 Feb 2026
- Granted
A) the construction of four new extensions with a total combined floor area of 2,522.50m², comprising — (i)…
Coláiste Dún Iascaigh , Cashel Road , Cahir
2660071TipperaryLodged 29 Jan 2026
- Granted
(i) the existing roof overhang on existing industrial/commercial building, (ii) for the existing WC extension…
Carrigeen Industrial Estate , Cahir , Co. Tipperary
2660033TipperaryLodged 19 Jan 2026
- Granted
The construction of 21 no. 3 bedroom dwelling units in three terraced blocks, to include roads, paths,…
Barnora , Cashel Road , Cahir
263TipperaryLodged 19 Jan 2026
- Awaiting decision
Development which will consist of: a) Construction of three new extensions with a total combined floor area…
Coláiste Dún Iascaigh , Cashel Road , Cahir
2660027TipperaryLodged 15 Jan 2026
- Granted
The extensive refurbishment of the building and the demolition of a single storey component to the rear…
Abbey Street , Cahir , Co. Tipperary
2561361TipperaryLodged 23 Dec 2025
- Awaiting decision
Development at Bakery Weir, located on the River Suir. The project site lies approximately 1.3km northeast of…
Bakery Weir , Barnora and Caherabbey Lower Townlands , Tipperary
2561293TipperaryLodged 12 Dec 2025
- Granted
The construction of an acoustic wall 5m high x 38m long and associated site works
Cahir Mart , Barnora , Cahir Co. Tipperary
2561288TipperaryLodged 12 Dec 2025
Contains Irish Public Sector Data licensed under CC BY 4.0. Settlement boundary: CSO Census 2022 urban areas (Tailte Éireann). Always confirm against the relevant authority’s official register.