Site 18 Townparks , Clonmel Road , Cahir Co. Tipperary
Storage container (until completion of dwelling) and (ii) the existing side boundary walls of site and…
2660782TipperaryLodged 11 Aug 2026
Planning register
Planning applications inside the Cahir, Co. Tipperary settlement, as recorded on the statutory register. The area is the CSO’s Census 2022 urban boundary.
The planning register for Cahir contains a total of 190 applications, with 137 applications granted, refused, or part-granted since 2016. Within this group of decided cases, 130 were granted, 7 were refused, and 0 were part-granted, resulting in a 95% grant rate. The most common development types are extensions at 22%, retention at 18%, alterations at 13%, and commercial developments at 12%. Recent application activity shows 20 applications lodged in 2023, 22 in 2024, and 21 in 2025, with recent granted examples including a sunroom extension, sports facilities, and various building refurbishments and extensions.
An automated reading of the figures on this page. Every statement reflects the register data shown above; it is not advice or a prediction.
95%
of 137 applications granted, refused or part-granted since 2016.
Historical outcomes from the statutory register. Not a prediction for any individual application.
How each kind of application has been decided in Cahir, 2016–2026.
| Category | Granted | Decided | Nationally |
|---|---|---|---|
| Extension | 100% | 32 | 95% |
“Decided” counts applications granted, refused or part-granted — withdrawn and invalid applications are excluded. Categories with fewer than 30 decided applications are not listed, because a rate over a handful of applications would not mean anything.
Applications lodged, by year
Grant rate, by year of decision
Storage container (until completion of dwelling) and (ii) the existing side boundary walls of site and…
2660782TipperaryLodged 11 Aug 2026
The construction of an extension to the side of dwelling
2660767TipperaryLodged 6 Aug 2026
A new extension to an existing shop, (ii) create a new enclosed loading area to rear of new extension…
2660714TipperaryLodged 22 Jul 2026
The use of the existing club house as a childcare facility and, b) RETENTION PERMISSION for the extension…
2660637TipperaryLodged 1 Jul 2026
The construction of an extension (pedestrian elevator area) to the front elevation of the service station…
2660617TipperaryLodged 24 Jun 2026
A Sunroom extension to existing dwelling house
2660292TipperaryLodged 2 Apr 2026
A sunroom extension to existing dwelling house
2660280TipperaryLodged 31 Mar 2026
The development which will consist of the partial removal of Bakery Weir and the non-functional fish pass to…
2660147TipperaryLodged 20 Feb 2026
The construction of four new extensions with a total combined floor area of 2,522.50m², comprising — (i)…
2660071TipperaryLodged 29 Jan 2026
The existing roof overhang on existing industrial/commercial building, (ii) for the existing WC extension…
2660033TipperaryLodged 19 Jan 2026
The construction of 21 no. 3 bedroom dwelling units in three terraced blocks, to include roads, paths,…
263TipperaryLodged 19 Jan 2026
Development which will consist of: a) Construction of three new extensions with a total combined floor area…
2660027TipperaryLodged 15 Jan 2026
Contains Irish Public Sector Data licensed under CC BY 4.0. Settlement boundary: CSO Census 2022 urban areas (Tailte Éireann). Always confirm against the relevant authority’s official register.