RefusedHousing estateDecided 19 June 2023

Knockboy, Dunmore Road, Waterford

Construction of 79 residential units, including 35 houses, 44 apartments, and a creche on Dunmore Road.

22513 · Waterford City and County Council · Lodged 9 June 2022

Reference
22513
Authority
Waterford City and County Council
Register status
Decided
Type
PERMISSION
Received
9 June 2022
Residential units
1
Floor area
1 m²

Summary

AI-generated

The proposed development consists of 79 residential units, comprising 35 two-storey houses and 44 apartments across multiple blocks. The scheme also includes a ground-floor creche, a new vehicular and pedestrian access point, and an ESB substation.

Housing estatehousing estateapartmentscreche

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The construction of a residential development of 79 no. Units consisting of the following; 2 no. 2-bed/semi-detached/two storey houses. 18 no. 2-bed/end-terrace/two storey houses. 15 no. 2-bed/mid-terrace/two storey houses. Comprising a total of 35 no. House units. 2 no. 2 storeys - block type 6; each one comprising: 4 no. 2-bed apartments at ground floor level 4 no. 2-bed apartments at first floor level 2 no. 3 storeys - block type 7, each one comprising; 4 no. 2-bed apartments at ground floor level 4 no. 2-bed apartments at first floor level 2 no. 2-bed apartments at second floor level 1 no. 3 storeys - block type 8, each one comprising: 1 no. Creche at ground floor level 2 no. 2-bed apartments at ground floor level 4 no. 2-bed apartments at first floor level 2 no. 2-bed apartments at second floor level comprising a total of 44 no. Apartment units. Permission is also sought to provide a new vehicular/pedestrian/cyclist access and one additional pedestrian access point at dunmore road to include alterations to the public footpath and road, ancillary drainage works including site attenuation, landscaping works, esb substation and all associated site works

Land-use zoning

What this land is zoned for

HAHA
Protect highly sensitive and scenic location from inappropriate development that would adversely affect the environmental quality of the locations.

National zoning type: Conservation, amenity or buffer space, corridor/belt, landscape

Objective set by the WCCC Development Plan 2022 - 2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
2 Rockmount, Ballygunner, Waterfordprice excludes VATApr 2025€300,000345 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received9 June 2022
  2. Further information requested2 August 2022
  3. Further information received19 April 2023
  4. Decision due21 June 2023
  5. Decision issued19 June 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.