Planning Permission Ireland
Awaiting decisionEnergy

Carriglong, Tramore, County Waterford

A major 596MWh battery energy storage system (BESS) facility in Tramore.

2560782 · Waterford City and County Council · Lodged 5 November 2025

Reference
2560782
Authority
Waterford City and County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
5 November 2025

Summary

AI-generated

The development consists of a renewable energy battery storage facility on a 2.08-hectare site. It will feature 117 containerised battery storage modules, 60 power convertor modules, security fencing, CCTV, and a transformer room.

Energyenergybattery storageinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A renewable energy development with a maximum storage capacity of 596mw/h in a development of a battery energy storage systems (bess) facility within a total site area of 2.08 hectares. The site will include 117 containerized battery storage modules with a height of 2.896m on concrete plinths, 60 dclv power convertor modules on concrete plinths, access track, associated electrical cabling, 2.4m high palisade security fence, security gates, cctv and security lighting system, mv switch and transformer room and all associated site development works this development is covered by the provisions of the renewable energy directive iii (directive (eu) 2023/2413) and it is important to note that the planning application may be subject to section 34d of the planning and development act 2000, as amended. When a notice issues in accordance with section 34d(b), the provisions of article 26a of the planning and development regulations 2001 to 2025 shall apply. The planning application is accompanied by ecological impact statement (eis).

Land-use zoning

What this land is zoned for

HAHA
Protect highly sensitive and scenic location from inappropriate development that would adversely affect the environmental quality of the locations.

National zoning type: Conservation, amenity or buffer space, corridor/belt, landscape

Objective set by the WCCC Development Plan 2022 - 2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received5 November 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.