Planning Permission Ireland
Awaiting decisionCommercialDecision was due 19 July 2026

Broad Street, Tramore, Waterford

Redevelopment of a derelict four-storey hotel into a 40-unit apart-hotel.

2660358 · Waterford City and County Council · Lodged 25 May 2026

Reference
2660358
Authority
Waterford City and County Council
Register status
In progress
Type
PERMISSION
Received
25 May 2026

Summary

AI-generated

The project involves redeveloping a derelict four-storey hotel into a 40-unit apart-hotel with a gross floor area of 3,812 sq.m. Works include partial demolitions, internal strip-out, elevational alterations, roof replacement, and the construction of a third-floor flat-roof extension.

Commercialhotelredevelopmentdemolition
Residential units
40
Storeys
4
Floor area
3,812 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development consists of the redevelopment of an existing four-storey derelict building, formerly a hotel, into a 40 no. Unit apart-hotel, with a gross floor area of 3,812 sq. M, including but not limited to the following works: a) demolition of ground floor single-storey annexes onto broad street and hotel square respectively; demolition of rear external projections, bay windows, ancillary spaces, stairwells and removal of the existing lift from the central courtyard; and demolition/removal of the building interiors back to structure, including non-structural walls; b) elevational alterations including the removal of all external windows and doors and replacement with new external windows and doors within existing and newly formed openings; formation and alteration of external entrances and openings; raising and aligning of parapet levels; re-rendering, feature tiling and painting of the external façades; c) removal, replacement and alteration of roof coverings, parapet cappings, roof plant, roof access, aovs, maintenance walkways, fall-arrest system and associated roof-level plant and services; d) construction of a third-floor single-storey flat-roof extension facing little market street; e) construction of new additions to the internal courtyard to include 2 no. Escape stairs, 1 no. Accommodation stair, 1 no. Lift including overrun, laundry/linen/service areas and apart-hotel accommodation; f) infill of existing undercroft areas and construction of new infill external walls; g) reinstatement and repair of existing floors; renovation and extension of the ground floor external store room on the western boundary into staff facilities, store and plant room; h) provision of ancillary apart-hotel facilities including reception/foyer, office, staff facilities, laundry, linen/storage, luggage storage, bin storage, plant and service areas; i) construction of a ground floor entrance canopy with associated signage and window awnings onto broad street; j) installation of illuminated building signage, including canopy-mounted signage, wall-mounted signage and roof/parapet-level signage; k) external site works including new footpaths, raised terraces, planters, front entrance steps, wheelchair-accessible paths, landscaped/defensible spaces, provision of 12 no. Car parking spaces including 1 no. Accessible parking space, road markings and all associated underground and above-ground services and connections.

Land-use zoning

What this land is zoned for

TCUC
Provide for the development and enhancement of town core uses including retail, residential, commercial, civic and other uses.

National zoning type: City/Town/village Centre, central area

Objective set by the WCCC Development Plan 2022 - 2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
11 Strand Hill Lane, Strand Hill, Tramoreprice excludes VATJun 2025€338,32565 m
8 Strand Hill Lane, Strand Hill, Tramoreprice excludes VATMay 2025€338,32675 m
6 Strand Hill Lane, Strand Hill, Tramoreprice excludes VATMay 2025€320,70575 m
2 Strand Hill Lane, Strand Hill, Tramoreprice excludes VATJun 2025€329,73075 m
10 Strand Hill Lane, Strand Hill, Tramoreprice excludes VATJul 2025€338,32675 m
9 Strand Hill Lane, Strand Hill, Tramoreprice excludes VATJun 2025€338,32675 m
4 Strand Hill Lane, Strand Hill, Tramoreprice excludes VATMay 2025€333,92175 m
1 Talbot Place, Tramore, WaterfordAug 2025€365,00077 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received25 May 2026
  2. Decision due19 July 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.