Planning Permission Ireland
GrantedIndustrialDecided 17 September 2025

Unit 31 and 32 Zone C Mullingar Business Park, Clonmore, Mullingar Co. Westmeath

Raising the roof height and building a 350 sqm extension at Mullingar Business Park.

2460332 · Westmeath County Council · Lodged 12 September 2024

Reference
2460332
Authority
Westmeath County Council
Register status
Decided
Type
PERMISSION
Received
12 September 2024

Summary

AI-generated

The development involves increasing the roof height of an existing building by 2.5 metres and constructing a 350 square metre extension. The project also includes concrete hardstanding, stormwater drainage infrastructure, and will require a review of the existing Waste Facility Permit.

Industrialindustrialextensionwaste permit
Floor area
350 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Development which will consist of
  • Increasing the roof height of an existing building by approximately 2.5 meters to achieve a new maximum height above finished ground level of 12.17 meters. It is also proposed to construct an extension to the same building with an approximate gross floor area of 350 sq. M, and again with maximum height above finished ground level of 12.17 meters
  • Provision of concrete hardstanding area surrounding the proposed shed extension
  • Installation of stormwater drainage and treatment infrastructure, comprising of interceptor and attenuation tank; and
  • All ancillary site development works. The proposed development will require a review of the existing "waste facility permit" which will be sought through a separate application through westmeath county council

Land-use zoning

What this land is zoned for

Enterprise & EmploymentSI
Provide for Enterprise & Employment and related uses including industrial and service uses including compatible uses such as office and distribution.

National zoning type: Industrial, enterprise, employment

Objective set by the MLAP 2014-2021 (2014–2025). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received12 September 2024
  2. Further information requested5 November 2024
  3. Further information received11 July 2025
  4. Decision due17 September 2025
  5. Decision issued17 September 2025
  6. Grant issued21 October 2025
  7. Permission expiry20 October 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.