Summary
AI-generatedThe development comprises an open area battery energy storage system (BESS) compound containing 264 battery modules, an IPP building, and a synchronous condenser compound. It also includes a high voltage customer compound for grid connection, a new entrance, and associated infrastructure.
- Floor area
- 35,626 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The energy storage system (ess) development will comprise: (i) an open area battery energy storage system (bess) compound(area of 26,317sqm) containing 264no battery modules and associated medium voltage power station (mvps) enclosures (12.192m long x 2.438m wide x 3.896m high), (ii) ipp building (40n long x 10m wide x 6.853m high), (iii) synchronous condenser compound (area of 9,309sqm) containing a horizontal synchronous generator positioned within a building (30.0m long x 18.0m wide x 12.15m high), 5no control modules each (12.192m long x 2.438m wide x 3.332m high), associated bunded transformers and electrical plant, (iv) high voltage (hv) customer compound containing 1no. Bunded transformers (9m high) and electrical plant to provide for connection to the electricity transmission system, and (v) all ancillary development, including lightening mast protection, perimeter fencing with access gates, landscaping, lighting, car parking, internal access roads and all civil engineering works for the disposal of foul and surface water. The development includes for construction of a new entrance and access road to the facility from the r446 with associated signage from the new entrance to the ess facility. Permission is sought for 10 years. An eiar has been prepared and accompanies this planning application
Key dates
Timeline
- Application received29 September 2021
- Further information requested23 November 2021
- Further information received26 January 2022
- Decision due22 March 2022
- Decision issued21 March 2022
- Grant issued11 May 2022
- Permission expiry10 May 2032
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Awaiting decision110 m away
Amendments to the Energy Storage System (ESS) facility (consented under Westmeath County Council Planning…
Kiltotan and Collinstown and Oldtown , Rochfortbridge , County Westmeath
2660145WestmeathLodged 29 Mar 2026Energy
- Granted160 m away
Development which will consist of (i) the construction of a new Administration/Control Building at a new…
Kiltotan and Collinstown and Oldtown , Rochfortbridge , Co. Westmeath
2360442WestmeathLodged 18 Dec 2023Industrial
- Granted160 m away
The development comprises 275MWe reserve gas-fired generator to boost and back up the power system and will…
Kiltotan and Collinstown and Oldtown , Rochfortbridge , Co Westmeath
21515WestmeathLodged 21 Sept 2021Energy
- Granted160 m away
Development which will consist of alterations to the development consented under Westmeath Planning Case Ref.…
Kiltotan and Collinstown and Oldtown , Rochfortbridge , County Westmeath
2460053WestmeathLodged 28 Feb 2024Alterations
- Granted340 m away
The development of a Data Centre Facility and Decentralised Energy Resource within an overall development…
Gneevebane Oldtown Farthingstown Castlelost and Kiltotan and Collinstown , Rochfortbridge , County Westmeath
2560344WestmeathLodged 8 Jul 2025Industrial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
The proposed development will consist of a battery energy storage system (BESS) located within a fenced…
a c. 1.7 ha site located within the ESB Inchicore substation site, specifically lands south of Kylemore Way and northwest of the existing ESB Substation, Kylemore Way, Dublin 8, D08 E398 and to the immediate west of the Kylemore BESS, Kylemore Road, Dubli
WEB2226/25Dublin CityLodged 30 May 2025
- Awaiting decisionEnergy
Permission for — 1no. enclosed battery energy storage system compound on a total of c. 2-hectare site, to…
Ballynanelagh Knockraha Co. Cork
25/4155corkLodged 7 Feb 2025
- Awaiting decisionEnergy
Permission for 1 no. enclosed battery energy storage system compound on a total of c. 2 hectare site, to…
Ballynanelagh Knockraha Co Cork
24/6103corkLodged 6 Nov 2024
- RefusedEnergy
For; (1) a Long Duration Energy Storage (LDES) facility contained within a secure outdoor compound (area of…
Coolpowra Cooldorragha Gortlusky Ballynaheskeragh & Sheeaunrush , Co. Galway , H53 Y997
2460845galwayLodged 8 Jul 2024
- GrantedEnergy
Will consist of a battery energy storage system (BESS) located within a fenced compound and will (subject to…
a c. 4.63 ha site within the former Lough Ree Power (LRP) Station , in the townlands of Aghamore and Lanesborough , Lanesborough (Lanesboro) Co. Longford
2460315LongfordLodged 19 Dec 2024
- GrantedEnergy
AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID ON A…
COOLCOR AND CLONIN , RHODE , CO. OFFALY
20238OffalyLodged 23 Jun 2020
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.