Planning Permission Ireland
RefusedIndustrialDecided 18 February 2020

Bollarney, Murrough, Wicklow

A new waste management facility and public recycling centre in Wicklow, involving demolition of derelict buildings.

191345 · Wicklow County Council · Lodged 16 December 2019

Reference
191345
Authority
Wicklow County Council
Register status
Decided
Type
PERMISSION
Received
16 December 2019

Summary

AI-generated

The development proposes a waste management facility handling up to 24,500 tonnes of waste per year, alongside a public recycling centre. The project includes a sorting building, offices, weighbridge, wastewater system, and the demolition of approximately 1,960 sqm of derelict buildings.

Industrialwaste managementrecyclingdemolition
Floor area
1,960 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Waste management facility for the acceptance, storage, sorting and transfer of non hazardous skip waste, construction and demolition waste, green waste and mixed dry recyclables and a public recycling centre for the acceptance of non hazardous household bulky waste, timber, dry recyclable waste, green biodegradable (landscaping type) waste, metal, glass and household weee and batteries. The total waste intake at the facility will be up to 24,500 tonnes per annum. The development will include the construction of a waste management facility to include site entrance, waste reception sorting and storage building, office building, a weighbridge, a weighbridge reception hut, car parking facilities, concrete hardstanding, a wastewater treatment system, foul water holding tank, surface water soakaway, silt trap, interceptor and all associated site works and additionally, the construction of a public recycling centre to include site entrance, non fixed waste receptacles (skips, bins, cages and bottle banks) a reception hut, traffic barriers and all associated site works. Works will also include the demolition of existing derelict buildings on the site (approx. 1960 sqm area) and the clean up and removal of historical waste at the existing site, the erection of boundary walls and railings and entrance gates, landscaping and native wildflower patches and provision of suitable lighting. It is proposed to operate the facility from 08.00 until 17.00 monday to friday and 08:00 to 14:00 on saturdays. It is not proposed to operate the facility on sundays or bank holidays. The development will require a waste management facility permit from wicklow county council. A natura impact statement will be submitted to the planning authority

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 11 July 2023.

Notified floor area: 384

2 commencement notices are linked to this development.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received16 December 2019
  2. Decision due18 February 2020
  3. Decision issued18 February 2020
  4. Appeal submitted13 March 2020
  5. Appeal decided8 April 2022
  6. Permission expiry7 April 2027

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.