Planning Permission Ireland
RefusedHousing estateDecided 16 July 2025

Kilbride, Arklow, Co. Wicklow

Demolition of three structures and construction of 666 residential units and a local centre in Arklow.

2560387 · Wicklow County Council · Lodged 23 May 2025

Reference
2560387
Authority
Wicklow County Council
Register status
Decided
Type
PERMISSION
Received
23 May 2025

Summary

AI-generated

The project involves the demolition of a two-storey house and two outbuildings to construct a major residential development. It will comprise 666 units, including 578 houses and 88 apartments, alongside a local centre with a creche, medical units, and retail spaces.

Housing estatehousing estateapartmentscrechedemolition
Residential units
666

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Demolition of 3 no. Structures on site including a 2-storey habitable house (total gfa 207 sq. M) and 2 no. Sheds/outbuildings (c. 580 sq. M). Closures of 2 no. Existing entrances onto the kilbride road (l-6179). Construction of a new residential development and local centre comprising: 666 no. Units (578 no. Semi-detached and terraced housing (100 no. 2 beds, 317 no. 3 beds, 161 no. 4 beds) and 88 no. Apartments and duplex apartments (24 no. 1 beds, 51 no. 2 beds and 13 no. 3 beds)). All residential units will have associated private open space facing north/ south/ east/ west. The proposal will also include a local centre (c. 2335 sq. M) comprising a creche (c. 1,095sqm) with outdoor play area, 3 no. Community/medical units (c. 450 sq. M), and 3 no. Retail units (c. 790sq. M). Building heights within the development will range from one to five storeys. The development will include streets, pedestrian/cycle links, open spaces/parks (with play areas) and will include amendments to the permitted open spaces and access road granted as part of the phase 1/character area 1a development (wcc reg. Ref. : 23/756 on the subject lands. The development will also include a public boardwalk/bridge for pedestrians and cyclists from the development across arklow town marsh and the avoca river to the arklow riverwalk north of arklow town car park and the town centre, with the bridge element (and associated works) across the avoca river constructed atop the concrete columns (debris traps) permitted as part of the arklow flood relief scheme (planning ref. Abp-310368-21). All associated site development works, site reprofiling, infrastructural and drainage works, surface water attenuation and natural attenuation areas, connection to public services and utilities (including undergrounding of esb lines), provision of substations, bin stores, bicycle stores, car and cycle parking at surface and undercroft levels, public lighting, landscaping and planting, public/communal/private open spaces and boundary treatment works. This development will form part of the designated kilbride action area plan aap3

Key dates

Timeline

  1. Application received23 May 2025
  2. Decision due17 July 2025
  3. Decision issued16 July 2025
  4. Appeal submitted12 August 2025
  5. Appeal decided1 December 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.