Planning Permission Ireland
Awaiting decisionIndustrial

Tober Upper, Dunlavin, Co. Wicklow

A phased 14.13-hectare extension to an existing quarry in Dunlavin.

2660114 · Wicklow County Council · Lodged 18 February 2026

Reference
2660114
Authority
Wicklow County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
18 February 2026

Summary

AI-generated

The development involves a phased extension to the south and south-east of the existing extraction area. It includes the extraction of up to 150,000 tonnes of sand, gravel, and stone per year, an additional wash plant, drainage infrastructure, and boundary berms.

Industrialquarryextractioninfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Phased extension to the existing quarry, measuring c. 14.13 hectares, located to the south/south-east of the existing extraction area, to be excavated to final floor levels ranging from approximately 202.7 m od at the north-western extent of the extension area to approximately 227.7 m od at the south-eastern extent of the extension area (as shown on the application drawings) and the extraction of approximately 150,000 tonnes per annum (being the maximum total output from the quarry as a whole) of sand, gravel and stone using mechanical means only. The development will also consist of: the provision of an additional wash plant (to supplement the existing wash plant); drainage infrastructure; fencing; boundary treatments (including berms and tree planting and the importation of geochemically suitable inert soil material, where required, to support berm construction); internal roads and access/haul routes; and all associated site works. (the proposed extension will operate using the existing permitted access to the r756, together with the existing internal haul road and all previously permitted processing and ancillary facilities, including: sand storage and testing lab shed, wash plant, water recycling system, sludge storage bay, water storage tank, wheelwash, well, pumphouse, temporary portacabin office, canteen, portaloo, berms, and mobile screening plant. ) the proposed extension of the existing quarry will operate for a period of 10 years from commencement of extraction within the extension area, after which an approved restoration and remediation plan will be implemented. An environmental impact assessment report (eiar) has been prepared in respect of the proposed development will be submitted to the planning authority with the application

Key dates

Timeline

  1. Application received18 February 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.