Tober Upper, Dunlavin, Co. Wicklow
Phased 14.13-hectare extension to an existing quarry to extract up to 150,000 tonnes of sand, gravel, and stone annually.
2660169 · Wicklow County Council · Lodged 10 March 2026
- Reference
- 2660169
- Authority
- Wicklow County Council
- Register status
- In progress
- Type
- PERMISSION
- Received
- 10 March 2026
Summary
AI-generatedPermission is sought for a phased extension of approximately 14.13 hectares to the south/south-east of an existing quarry. The project includes extracting up to 150,000 tonnes of sand, gravel, and stone per year, installing an additional wash plant, drainage infrastructure, and constructing boundary berms using imported inert soil.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Phased extension to the existing quarry, measuring c. 14.13 hectares, located to the south/south-east of the existing extraction area, to be excavated to final floor levels ranging from approximately 202.7 m od at the north-western extent of the extension area to approximately 227.7 m od at the south-eastern extent of the extension area (as shown on the application drawings) and the extraction of approximately 150,000 tonnes per annum (being the maximum total output from the quarry as a whole) of sand, gravel and stone using mechanical means only. The development will also consist of: the provision of an additional wash plant (to supplement the existing wash plant); drainage infrastructure; fencing; boundary treatments (including berms and tree planting and the importation of geochemically suitable inert soil material, where required, to support berm construction); internal roads and access/haul routes; and all associated site works. (the proposed extension will operate using the existing permitted access to the r756, together with the existing internal haul road and all previously permitted processing and ancillary facilities, including: sand storage and testing lab shed, wash plant, water recycling system, sludge storage bay, water storage tank, wheelwash, well, pumphouse, temporary portacabin office, canteen, portaloo, berms, and mobile screening plant). The proposed extension of the existing quarry will operate for a period of 10 years from commencement of extraction within the extension area, after which an approved restoration and remediation plan will be implemented. An environmental impact assessment report (eiar) has been prepared in respect of the proposed development will be submitted to the planning authority with the application
Key dates
Timeline
- Application received10 March 2026
- Further information requested28 April 2026
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Awaiting decision50 m away
Phased extension to the existing quarry, measuring c. 14.13 hectares, located to the south/south-east of the…
Tober Upper , Dunlavin , Co. Wicklow
2660114WicklowLodged 18 Feb 2026Industrial
- Granted220 m away
Wash plant, including a water recycling system, sludge storage bay, water storage tank and all ancillary…
Tober Upper , Dunlavin , Co. Wicklow
191069WicklowLodged 1 Oct 2019Industrial
- Granted230 m away
8.4 hectare extension to the existing quarry permitted under PRR04/699 and substitute consent no. SU0012.…
Tober Upper , Dunlavin , Co. Wicklow
18677WicklowLodged 19 Jun 2018Industrial
- Granted230 m away
A 406sqm sand storage and testing lab shed for existing quarry and associated works
Tober Upper , Dunlavin , Co. Wicklow
22706WicklowLodged 27 Jun 2022Industrial
- Awaiting decision280 m away
Extraction of sand and gravel from an existing quarry which is additional to that permitted by planning…
Tober Upper , Dunlavin , Co. Wicklow
18618WicklowLodged 7 Jun 2018Industrial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionIndustrial
Phased extension to the existing quarry, measuring c. 14.13 hectares, located to the south/south-east of the…
Tober Upper , Dunlavin , Co. Wicklow
2660114WicklowLodged 18 Feb 2026
- GrantedIndustrial
Continuance of use of existing quarry and associated processing previously permitted under P.Ref. 93/607,…
Tyfarnham , Down & Rathlevanagh Townlands , Knockdrin
22204WestmeathLodged 21 Apr 2022
- Awaiting decisionIndustrial
For development. The proposed development will take place within an overall application area of approximately…
Kilree Sheastown , Bennettsbridge , Co. Kilkenny
2560463KilkennyLodged 25 Jul 2025
- GrantedIndustrial
An extension of 2.1ha to the south of the permitted existing operational quarry made up of 1.6ha of…
Coolbane Quarry, Coolbane, Caheragh, West Cork
20138corkLodged 13 Mar 2020
- GrantedIndustrial
Quarry development and associated processing previously permitted under P. Reg. Ref. No. 99/2042 and ABP Ref.…
Kilrainy and Kilrathmurry Townlands , Clonard , Co. Kildare
2360266KildareLodged 2 Oct 2023
- GrantedIndustrial
For continued use of the existing quarry (granted under Planning Ref. File No.: 06/2275 and ABP Ref.:…
Cartron , Belclare , Co. Galway
2560750galwayLodged 12 Jun 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.