Planning Permission Ireland
Awaiting decisionInfrastructure

Kellistown East, County Carlow

Development of a synchronous condenser grid support facility in Kellistown.

21389 · Carlow County Council · Lodged 13 October 2021

Reference
21389
Authority
Carlow County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
13 October 2021

Summary

AI-generated

A 10-year planning permission is sought for a synchronous condenser grid support facility on a 1-hectare site. The facility will connect to the adjoining ESB Kellistown Electricity Substation and feature a 540 sqm building, cooling equipment, and modular containers.

Infrastructuregrid supportsubstationinfrastructure
Floor area
540 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for a 10 year planning permission for the development of a synchronous condenser grid support facility, which will connect to the adjoining esb kellistown electricity substation. The proposed development will have a projected life span of 50 years. At the end of life the proposed development can either be decommissioned or refurbished to extend its life. The development is to be located within a site compound c. 1 ha. It will regulate reactive power on the electricity network and will consist of the following elements: a building (c 540 sqm. C 10m high) to house equipment including a synchronous condenser with flywheel, lube oil skid, air compressor and pumps. Equipment to be located outside the footprint of the building but within a fenced compound will include cooling equipment (c 160 sqm. C 3m high) 6 no. Modular containers to house electrical and control equipment (total area of c 195 sq m c 5m high), a step-up transformer, an auxiliary transformer, an external circuit breaker, electrical balance of plant, 1 no. Firefighting water tank, above ground oil separator and collection pit c 100m of underground cabling ducts and cable to the adjoining esb substation, balustrade boundary fencing, security entrance gate and cctv, all other and miscellaneous site works to include site clearance, site access, internal roads and development of areas of hard standing and lay-down area. The proposed development will connect by underground cable to the electricity supply board (sesb) 220kv substation adjoining the western boundary of the proposed development site. This underground cabling will not form a part of the transmission networks as defined in section 2(1) of the electricity regulation act 1999.

Key dates

Timeline

  1. Application received13 October 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.