Dunnstown, Brannockstown, Naas
Construction of a synchronous condenser grid support facility next to Dunnstown Substation.
221016 · Kildare County Council · Lodged 19 August 2022
- Reference
- 221016
- Authority
- Kildare County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 19 August 2022
Summary
AI-generatedThis application seeks a 10-year planning permission for a synchronous condenser grid support facility with a projected 50-year lifespan. Located on a 1-hectare site, it will regulate reactive power on the electricity network. The development includes a 540 sqm building, cooling equipment, six modular containers, transformers, and associated infrastructure.
- Floor area
- 540 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
10 year planning permission to develop a synchronous condenser grid support facility, which will connect to the adjoining esb dunnstown electricity substation in the townland of dunnstown, brannockstown, naas, co. Kildare. The proposed development will have a projected life span of 50 years. At the end of life the proposed development can either be decommissioned or refurbished to extend its life. The development is to be located within a site compound c. 1 ha. It will regulate reactive power on the electricity network and will consist of the following elements: a building (c. 540 sqm. C. 12m high) to house equipment including a synchronous condenser with flywheel, lube oil skid, air compressor and pumps. Equipment to be located outside the footprint of the building but within a fenced compound will include cooling equipment (c. 160sqm. , c. 3m high); 6 no. Modular containers to house electrical and control equipment (total area of c. 195 sqm. , c. 5m high): a step-up transformer, an auxiliary transformer, an external circuit breaker, electrical balance of plant. 1 no. Firefighting water tank, above ground oil separator and collection pit, c. 100m of underground cabling ducts and cable to the adjoining esb substation, balustrade boundary fencing, security entrance gate and cctv, all other ancillary and miscellaneous site works to include site clearance, site access, internal roads and development of areas of hard standing any lay-down area. The proposed development will connect by underground cable to the electricity supply board (esb) 220kv substation adjoining the western boundary of the proposed development site. This underground cabling will not form a part of the transmission networks as defined in section 2(1) of the electricity regulation act 1999
Key dates
Timeline
- Application received19 August 2022
- Further information requested11 October 2022
- Further information received24 October 2022
- Decision due20 November 2022
- Decision issued17 November 2022
- Grant issued25 January 2023
- Permission expiry24 January 2033
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Awaiting decision180 m away
For a 10 year planning permission to develop a synchronous condenser grid support facility, which will…
Dunnstown , Co. Kildare.
211282KildareLodged 8 Sept 2021Energy
- Refused200 m away
For a 10 year planning permission to develop a synchronous condenser grid support facility, which will…
Dunnstown , Brannockstown , Naas
211371KildareLodged 24 Sept 2021Energy
- Refused230 m away
Sought for Bloodstock development consisting of: (A) Single storey stable building consisting of 6no. horse…
Dunnstown , Brannockstown Road , Naas
2560168KildareLodged 23 Feb 2025Agricultural
- Granted320 m away
Of an existing 30 metre high telecommunications support structure with antennas, equipment container and…
ESB Dunstown , Dunstown Townland , Co. Kildare.
181578KildareLodged 21 Dec 2018Retention
- Refused370 m away
Storey and a half dwelling house, single storey garage, waste water treatment system, new gravelled access…
Dunnstown , Brannockstown Road , Naas
18673KildareLodged 5 Jun 2018New dwelling
- Awaiting decision400 m away
Storey and half dwelling house, single storey garage, waste water treatment system, new gravelled access…
Dunnstown , Brannockstown Road , Naas
18641KildareLodged 30 May 2018New dwelling
- Refused410 m away
Storey and half dwelling house, single storey garage, waste water treatment system, new gravelled access…
Dunnstown , Brannockstown Road , Naas
17829KildareLodged 18 Jul 2017New dwelling
- Granted420 m away
4 no. 15m high floodlighting masts to existing playing pitch along with skills wall 28.5 metre long x 5 metre…
Harristown Commons , Two Mile House , Naas
23286KildareLodged 22 Mar 2023Infrastructure
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- RefusedEnergy
For a 10 year planning permission to develop a synchronous condenser grid support facility, which will…
Dunnstown , Brannockstown , Naas
211371KildareLodged 24 Sept 2021
- GrantedEnergy
Permission for a 10 year planning permission for the development of a synchronous condenser grid support…
Kellistown East , Co. Carlow
21445CarlowLodged 17 Nov 2021
- RefusedInfrastructure
For a development consisting of the development and operation of a 150 to 500 MVA (electrical rating)…
Barrettspark ,
22303galwayLodged 7 Mar 2022
- GrantedEnergy
For the development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. The…
Barrettspark ,
221006galwayLodged 26 Aug 2022
- GrantedEnergy
Development consisting of: The 10 year permission for the construction and operation of a synchronous…
Ballysumaghan , Co. Sligo
22351SligoLodged 26 Oct 2022
- GrantedEnergy
Development consisting of a 10 year permission. The development will consist of the development and operation…
Ballysumaghan , Sooey , Co Sligo
2090SligoLodged 19 Mar 2020
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.