Tooreen Cahernalough Knockanean, Ballymacahill Muckinish and Rosslevan, Tulla Road Ennis Co Clare
Demolition of a farmhouse and construction of a massive 6-building data centre campus in Ennis.
21757 · Clare County Council · Lodged 16 July 2021
- Reference
- 21757
- Authority
- Clare County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 16 July 2021
Summary
AI-generatedA 10-year permission is sought for a 60-hectare site to construct 6 two-storey data centre buildings with three-storey plant/office levels, totaling 118,740 sqm. The development requires the demolition of an existing farmhouse and 8 outbuildings, and includes backup generators and associated infrastructure.
- Storeys
- 3
- Floor area
- 118,740 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- a permission of 10 years in duration is sought. The application site has a total of c. 60 hectares with a nett area for development of c. 45 hectares, and is bound to the south by r352 (tulla road), to the east and the north by agriculture land, to the west by the m18. The development will consist of: the demolition of an existing single storey with pitched roof farm dwelling house together with 8 no. Farm outbuildings on the overall site. The construction of 6 no. Two storey data centre buildings with three storey plant/office levels and associated ancillary development that will have a combined gross floor area of 118,740 sqm. These data halls are maximum 19m high and will consist of the data halls and air handling units and offices and ancillary plant and support. Each of the six data centre buildings will include data halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, pump rooms, water storage tanks, and plant, as well as backup (standby) generators (11 no. Per building) for emergency use only situated along one elevation of each building. The standby diesel generators will have associated 8 m high flues. Each generator will also include local diesel storage tanks with a single refuelling area to serve the proposed emergency generators. A gas powered energy centre and above ground installation (agi)4,674 sqm in size . The energy centre will primarily comprise 18 no. Lean-burn natural gas engines, 2 no. Pump rooms, and fuel storage compound. Each generator will have its own flue of 25m height. The energy centre and buildings within the compound will be 12 m high, single storey with mezzanine level. The buildings will house ancillary office, welfare facilities and associated parking. A two storey vertical farm building. The vertical farm will be c. 2,430 sqm and 12m high. It will comprise c. Service area of 1,444 sqm, handling area of 844 sqm and ancillary areas. Please see newspaper notice for full development description
Land-use zoning
What this land is zoned for
“Lands zoned for ‘enterprise’ shall be taken to include the use and development of land for high end research and development, business science and technology-based industry, financial services, call centres/telemarketing, software development etc.”
National zoning type: Industrial, enterprise, employment
Objective set by the Ennis and Environs (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| Maghera, Lahinch, Co Clare | Oct 2025 | €110,000 | 346 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received16 July 2021
- Further information requested8 September 2021
- Further information received25 February 2022
- Decision due8 August 2022
- Decision issued8 August 2022
- Grant issued15 April 2024
- Appeal submitted30 August 2022
- Appeal decided5 April 2024
- Permission expiry14 April 2029
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted440 m away
For development which will consist of; A new dwelling house, new garage, new site entrance and wastewater…
Tooreen , Ennis , Co. Clare
2560148ClareLodged 26 Mar 2025New dwelling
- Refused440 m away
For development, the development will consist of a new dwelling house, new garage, new site entrance and…
Tooreen , Ennis , Co Clare
23629ClareLodged 14 Dec 2023New dwelling
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedIndustrial
Construction of two single storey data centres with associated office and service areas; and three gas…
Site within the townland of Ballymakaily, West of Newcastle Road (R120), Lucan, Co. Dublin
SD21A/0042South DublinLodged 14 Dec 2021
- Awaiting decisionIndustrial
For a Data Centre and will comprise of: The demolition of 3 no. dwelling houses, associated garages and farm…
Townlands of Halverstown Jigginstown and Newhall , Naas , County Kildare.
2460740KildareLodged 1 Aug 2024
- Awaiting decisionInfrastructure
The development being applied for consists of the following to be constructed in a minimum of four phases:…
Bracetown & Gunnocks , To the North Of Clonee , Co. Meath
RA191560MeathLodged 22 Nov 2019
- GrantedEnergy
Construction of 3 no. data hall buildings with ancillary offices, staff areas, front and back of house areas,…
Former Clyde House, IDA Blanchardstown Business and Technology Park, Snugborough Road, Blanchardstown, Dublin 15
FW20A/0087/E1FingalLodged 1 Sept 2025
- GrantedIndustrial
The proposed development consists of the following: construction of a two storey (with mezzanine levels at…
Drogheda IDA Business & Technology Park , Donore Road , Drogheda Co Meath
21663MeathLodged 12 Apr 2021
- GrantedIndustrial
Permission for a period of ten years for development at this site of 16.5 hectares that is located within…
Townlands within Grange Castle South Business Park, Baldonnel, Dublin 22
SD20A/0121South DublinLodged 16 Jul 2020
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.