GrantedEnergyDecided 21 October 2025

Former Clyde House, IDA Blanchardstown Business and Technology Park, Snugborough Road, Blanchardstown, Dublin 15

Extension of duration for a data centre development in Blanchardstown.

FW20A/0087/E1 · Fingal County Council · Lodged 1 September 2025

Reference
FW20A/0087/E1
Authority
Fingal County Council
Register status
Decided
Type
Extension Of Duration Of Permission
Received
1 September 2025

Summary

AI-generated

The project involves an extension of duration for the construction of 3 data hall buildings ranging from 1 to 3 storeys, a 2-storey generator building, fuel tanks, water tanks, and associated infrastructure at the former Clyde House site.

Energydata centreextension of durationindustrial
Storeys
4

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Construction of 3 no. Data hall buildings with ancillary offices, staff areas, front and back of house areas, entrance lobbies, toilets, storage, associated plant throughout, photovoltaic panels and screened plant areas at roof levels. The proposed data hall buildings range from 1-3 storeys including front of house areas at a 4th floor level serving building
  • The single storey rotunda building will be retained and reconfigured from previously permitted under (reg. Refs. Fw18a/0032 and fw19a/0176) as front of house comprising lobby, offices, meeting rooms, workshops, associated staff areas and toilets. The overall height of the data hall buildings ranges from c. 5.7m to c. 17.6m to roof level and c. 14.4m to c. 24.8m including the roof top plant. The proposed development includes the provision of a 2 storey generator building (c. 1,990sqm) comprising 20 no. Mv generators and generator rooms, loadbank and customer compound with 5 no. Flues c. 19m high; 2 no. Transformers (c. 88sqm each); skip compactor and bin store area (c. 51sqm); fuel pump room (c. 24sqm); 12 no. Above ground fuel tanks (c. 8.4m high) within a fuel compound; 7 no. Water tanks (c. 16m high); water treatment plant room (c. 228sqm); 2 no. Salt saturators (c. 5.7m high); heat recovery plant room (c. 49sqm); sprinkler pump room (c. 32sqm) and 2 no. Sprinkler tanks (c. 13.6m high). The total gross floor area of the data halls, front of house and ancillary structures is c. 25,225sqm. All associated site development works, services provision, drainage works, landscaping, boundary treatment works, access roads/service entrance, loading bays, vehicular/pedestrian access, security gates, car parking, motorcycle parking and bike stores. No works are proposed to the existing telecommunication pylon and overhead lines running diagonally through the site from south west to north east. A proposed 110kv substation located to the south east of this site is subject of a separate strategic infrastructure development application to an bord pleanála under section 182a of the planning and development act 2000 (as amended)

Key dates

Timeline

  1. Application received1 September 2025
  2. Decision due24 October 2025
  3. Decision issued21 October 2025
  4. Permission expiry1 January 2031

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.