Planning Permission Ireland
Awaiting decisionEnergy

Booltiagh, Ennis, Co. Clare

Construction of a battery storage facility with 240 units and a control building in Booltiagh.

2360404 · Clare County Council · Lodged 29 September 2023

Reference
2360404
Authority
Clare County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
29 September 2023

Summary

AI-generated

A 10-year planning permission is sought for a battery storage array facility with a 35-year operational lifetime. The development includes 240 battery units, a 140 sqm control building, transformers, inverters, and security infrastructure on a 1.42-hectare site.

Energybattery storagegridinfrastructure
Floor area
140 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist 10 year planning permission for the construction and operation of battery arrays (240 number units, each 1.87m2 by c. 2.32m tall), a control building with gross floor area 140m2 by 6.40m tall, 3 number 12mva transformers (c. 3.5m tall), 1 number 2.5mva transformer (c. 2.5m tall) and inverters (24 number units, each 1.85m2 by c. 2.22m tall. The development will include for ancillary infrastructure including security fencing, lighting, cctv, internal access roads and drainage. The development will have a 35 year operational lifetime. The overall development site is ca. 1.42 hectares (ha).

Key dates

Timeline

  1. Application received29 September 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.