Planning Permission Ireland
RefusedEnergyDecided 17 December 2025

Ballycunneen Drumline Ballycasey More, Clonmoney West Firgrove & Ardkyle, Co. Clare

Proposed solar farm development with ground-mounted panels, battery storage, and substation connection.

2560560 · Clare County Council · Lodged 11 September 2025

Reference
2560560
Authority
Clare County Council
Register status
Appealed
Type
PERMISSION
Received
11 September 2025

Summary

AI-generated

The development consists of a solar farm across multiple townlands featuring ground-mounted solar PV panels. It includes a co-located Battery Energy Storage System (BESS), 11 MV stations, security fencing, CCTV, and an underground cable connection to the Drumline 110kV substation.

Energysolarrenewablebattery storageinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • For a proposed solar farm development which is located across the townlands of ballycunneen, drumline, ballycasey more, clonmoney west, firgrove, and ardkyle, in county clare. The development will consist of
  • Linear arrays of solar pv panels on ground mounted steel supported structures with associated cabling and ducting (including underground cable grid connection to the drumline 110kv substation)
  • 2 no. Horizontal directional drilling (hdd) locations associated with interconnecting cable routes
  • 11 no. Proposed single storey mv stations
  • A co-located battery energy storage system (bess) installation (including 20 no. Containers with cells and 5no. Containers with pcs mv stations)
  • Site perimeter fencing
  • Palisade double security gates at all temporary (3no. ) and permanent (3 nno. ). Site entrances
  • Site access tracks including passing and turning bays
  • On-site pole mounted cctv cameras
  • 2no. Temporary construction compound/carpark/material storage areas with associated temporary site offices, parking areas and security fencing
  • 8 no. Steel storage containers
  • 5 no. Turning bays
  • 3 no. Temporary construction stage wheel wash systems
  • Temporary soil storage areas; and
  • All associated and ancillary works. The proposed solar farm development spans a total site area measuring 98ha. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of solar pv on the site is estimated to be up to 60mw. The development is covered by the provisions of the renewable energy directive iii (directive (eu) 2023/2413). X yes no if yes above, important to note that the planning application is subject to section 34d of the planning and development act, 2000, as amended. When a notice issues in accordance with section 34d(b), the provisions of article 26a of the planning and development regulations 2001 to 2025 shall apply. An appropriate assessment screening report (aasr) and natura impact statement (nis) has been prepared for this development and submitted with this planning application

Key dates

Timeline

  1. Application received11 September 2025
  2. Decision due18 December 2025
  3. Decision issued17 December 2025
  4. Appeal submitted22 January 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.