Planning Permission Ireland
RefusedEnergyDecided 30 December 2025

Kilmullen Ullard or Controversyland Clonanny Lea and Loughmansland Glebe, Portarlington, Co. Laois

Development of a solar farm and battery storage facility on a 60.36-hectare site near Portarlington.

2560611 · Laois County Council · Lodged 23 September 2025

Reference
2560611
Authority
Laois County Council
Register status
Appealed
Type
PERMISSION
Received
23 September 2025

Summary

AI-generated

The proposed development consists of linear arrays of ground-mounted solar PV panels and a co-located Battery Energy Storage System (BESS) park. The project includes inverter stations, grid connection infrastructure to the Bracklone substation, security fencing, and a temporary construction compound across a 60.36-hectare site.

Energysolarbattery storagerenewable energyinfrastructure
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Develop the following within co. Laois
  • Linear arrays of solar pv panels on ground mounted steel supported structures with associated cabling and ducting (including onsite control and switch gear room and underground cable grid connection to the bracklone 110kv substation)
  • 2 no. Proposed single storey inverter stations
  • A co-located battery energy storage system (bess) park (including 16 no. Containers with cells and 4 no. Containers with pcs and inverters) with associated security fencing and gates
  • Site perimeter fencing
  • 1 no. New site entrance with palisade double security gates
  • 1 no. Temporary construction compound/carpark/material storage area with associated temporary site offices, parking areas and security fencing
  • 1 no. Temporary and 1 no. Permanent steel storage containers
  • Site access tracks including passing and turning bays
  • On-site pole mounted cctv cameras
  • 1 no. Temporary construction stage moby dick type wheel wash systems
  • 1 no. Concrete wash out locations (within temporary construction compound); and
  • All associated and ancillary works the proposed solar farm development spans a total site area measuring 60.36 ha, of which 37.66 ha is located in co. Kildare and 22.7 ha is located in co. Laois. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of solar pv on the site is estimated to be 32 mw. An appropriate assessment screening report (aasr) and natura impact statement (nls) has been prepared for this development and submitted with this planning application. The development is covered by the provisions of the (red iii) renewable energy directive iii (directive (eu) 2023/2413 ). The planning application is subject to section 34d of the planning and development act, 2000, as amended. When a notice issues in accordance with section 34d(b), the provisions of article 26a of the planning and development regulations 2001 to 2025 shall apply

Key dates

Timeline

  1. Application received23 September 2025
  2. Decision due1 January 2026
  3. Decision issued30 December 2025
  4. Appeal submitted29 January 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.