RefusedEnergyDecided 3 July 2026

Tooreen, Slievenalicka, Drumbaun & Lackamore

Construction of a 150m wind turbine and electrical substation in County Clare.

2660207 · Clare County Council · Lodged 31 March 2026

Reference
2660207
Authority
Clare County Council
Register status
Decided
Type
PERMISSION
Received
31 March 2026

Summary

AI-generated

The development consists of a single wind turbine with a maximum blade tip height of 150 metres. It includes associated foundations, a permanent 38 kV electrical substation, access road upgrades, two borrow pits, and a peat repository area.

Energywind energyturbinesubstation
Residential unit
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • For the development of the slievenalicka wind turbine in the townlands of tooreen, slievenalicka, drumbaun & lackamore (although no infrastructure will be sited within lackamore townland), county clare. The development will consist of
  • Construction of 1 wind turbine with a maximum overall blade tip height of 150m
  • Construction of associated turbine foundations, crane pad hardstand and assembly areas
  • Construction of one permanent 38 kv electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works
  • All associated internal underground electrical and communications cabling connecting the wind turbines to the on-site substation
  • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction & operation of the wind farm
  • Two borrow pits
  • One peat repository area for peat & spoil management
  • Construction of one temporary construction compound
  • Development of internal site drainage
  • Permanent & temporary tree felling to accommodate the construction & operation
  • Signages and
  • All associated site development works. This application is seeking 10-year planning permission, along with a 35-year operational life for the wind farm from the date of its commissioning. The development is covered by the provisions of the renewable energy directive iii (directive 2023/2413). The planning application is subject to section 34d of the planning and development act, 2000, as amended. When a notice is issued in accordance with section 34d(b), the provisions of article 26a of the planning and development regulations 2001 to 2025 shall apply. An environmental impact assessment report (eiar) has been prepared in respect of the planning application and will be submitted to the planning authority with the application

Key dates

Timeline

  1. Application received31 March 2026
  2. Decision due6 July 2026
  3. Decision issued3 July 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.