RefusedEnergyDecided 2 July 2025

Moanmore Lower Moanmore South Tullabrack Tullabrack East and Gower South, Kilrush, Co. Clare

Construction of a 3-turbine wind farm with a maximum tip height of 150m near Kilrush.

2560257 · Clare County Council · Lodged 8 May 2025

Reference
2560257
Authority
Clare County Council
Register status
Appealed
Type
PERMISSION
Received
8 May 2025

Summary

AI-generated

The proposed renewable energy development includes the erection of 3 wind turbines with a tip height of 150m and a total generating capacity of 15MW. The project also involves constructing turbine foundations, hard stands, access tracks, a new site entrance, a temporary construction compound, a 38kV electrical substation, and a permanent spoil storage area.

Energywind farmrenewable energysubstationinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • For a renewable energy development in the townlands of moanmore lower, moanmore south, tullabrack, tullabrack east and gower south, kilrush, co clare. The development will include the
  • Erection of 3 no. Wind turbines with an overall ground to blade tip height of 150m, with a rotor diameter of 136m and a hub height of 82m and a total generating capacity of 15mw
  • Construction of turbine hard stand areas and turbine foundations
  • Construction of new internal site access tracks and upgrade of existing site track, to include all associated site drainage
  • Construction of
  • No new site entrance along the turbine delivery route with access onto the adjoining local road network (l6132)
  • Construction of 1 no. Temporary construction compound with associated temporary site offices, parking areas and security fencing
  • Development of a site drainage network
  • Construction of 1 no. 38kv electrical substation with all associated electrical plant and equipment, security fencing, lightening protection, security cameras and gates, and all ancillary structures and works
  • 1 no. Permanent spoil storage area
  • All wind farm internal cabling connecting the wind turbines to the electrical substation
  • All works associated with the permanent connection of the wind farm to the national electricity grid comprising a 38kv underground cable in permanent cable ducts from the proposed, permanent, on-site substation and to the existing tullabrack 110kv esbn substation
  • 2 no. Flood compensation areas
  • Vertical realignment of an existing crest curve on the l6132 local road in order to prevent grounding of abnormal load vehicles during delivery of turbine components
  • Ancillary forestry felling to facilitate construction and operation of the development
  • Construction of a blade transfer area off the l6132
  • Provision of 2 no. Biodiversity enhancement areas
  • Upgrade of an existing site entrance onto the adjoining local road network (l2034) including the demolition of an existing wall and removal of hedgerow at the site entrance to facilitate abnormal load vehicles during delivery of turbine components and reconstruction of same wall and replanting of hedgerow
  • Landscaping and all associated ancillary works. This application is seeking a ten year permission and a 40 year operational life from the date of commissioning of the wind farm. The planning application is accompanied by an environmental impact assessment report (eiar) and a natura impact statement (nis)

Key dates

Timeline

  1. Application received8 May 2025
  2. Decision due2 July 2025
  3. Decision issued2 July 2025
  4. Appeal submitted28 July 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.