Awaiting decisionEnergy

Glendine North Fahanlunaghta More, Curraghodea LetterKelly Cloghaun More Cloghaun Beg, Silverhill Doonsallagh East Shanavogh East and Knockalassa Co. Clare

A 10-year planning permission for a wind farm with up to 8 turbines in County Clare.

20806 · Clare County Council · Lodged 3 November 2020

Reference
20806
Authority
Clare County Council
Register status
Withdrawn
Type
PERMISSION
Received
3 November 2020

Summary

AI-generated

The proposed renewable energy development near Miltown Malbay will feature up to 8 wind turbines with a maximum tip height of 175 metres. It includes a 110-metre meteorological mast, underground cabling, substation extensions, and new access roads.

Energywind farmrenewableturbinesinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For a 10-year planning permission for the construction of a renewable energy development, in the townlands of glendine north, fahanlunaghta more, curraghodea, letterkelly, cloghaun more, cloghaun beg, silverhill, doonsallagh east, shanavogh east and knockalassa, co clare (approximately 6.5km to the east of miltown malbay). The development will consist of the provision of the following: i. Up to 8 no. Wind turbines with a maximum overall ground to blade tip height of up to 175 metres; ii. A thirty-year operational life from the date of full commissioning of the development and subsequent decommissioning. Iii. A meteorological mast with a maximum height of up to 110 metres; iv. Underground cabling (33kv) connecting the proposed turbines to an existing 110kv substation in the townland of knockalassa; v. Permanent extension to the 110kv substation at knockalassa comprising of a new control building with welfare facilities, associated electrical plant and equipment and security fencing; vi upgrade of access junctions; vii upgrade of existing tracks/ roads and provision of new site access roads and hardstand areas; viii. 2 no. Borrow pits; ix 2 no. Temporary construction compounds; x. Site drainage; xi forestry felling; xii. Operational stage site signage; and xiii. All associated site development works and apparatus. An environmental impact assessment report (eiar) and a natura impact statement (nis) have been prepared in respect of the proposed development.

Key dates

Timeline

  1. Application received3 November 2020
  2. Application withdrawn18 January 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.