Planning Permission Ireland
GrantedCommercialDecided 25 April 2017

93-95 South Mall, 17 Parnell Square and, Beasley Street

Redevelopment and extension of a permitted hotel building in Cork City, including partial demolitions.

1637224 · Cork City Council · Lodged 22 December 2016

Reference
1637224
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
22 December 2016

Summary

AI-generated

The project involves extensive redevelopment of a permitted hotel building across South Mall, Parnell Square, and Beasley Street. Works include converting basement levels, adding new extensions to provide additional bedrooms, and partial demolition of existing structures.

Commercialhotelredevelopmentcity centre

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The proposed development will consist of the redevelopment of the existing permitted hotel building to comprise the following
  • The conversion of lower basement car park to storage/plant area and staff facilities area to include office, toilets, canteen and meeting rooms
  • The conversion of the upper basement car park to 8 no. Bedrooms, a business centre with 10 no. Meeting rooms, storage areas and retail basement (75sqm)
  • At ground floor level, the redevelopment and remodelling of internal floor area to include reception, bar, lounge, dining and kitchen areas, esb substation, toilets, service areas, bin store and retail unit (132sqm) onto parnell place
  • At 1st floor level, the provision of 33 no. Bedrooms and roof terrace
  • At 2nd floor level, the provision of 35 no. Bedrooms
  • At 3rd floor level, the provision of 35 no. Bedrooms
  • At 4th floor level, the construction of a new extension at parnell place and the provision of 31 no. Bedrooms
  • At 5th floor level, the construction of a new extension at beasley street and the provision of 23 no. Bedrooms
  • The demolition of no. 95 south mall and partial demolition of nos. 93 and 94 south mall
  • The reinstatement of the façades of nos. 17 and 18 parnell place which are protected structures
  • Elevational changes to existing beasley street elevation to include incorporation of outdoor seating area
  • Removal of existing car lifts to provide light wells
  • All associated plant, development and site services and works. A total of 165 no. Bedrooms are proposed

Land-use zoning

What this land is zoned for

City CentreUC
To consolidate and facilitate the development of the central area and to promote its role as a dynamic mixed used centre for community, economic, civic, cultural and residential growth.

National zoning type: City/Town/village Centre, central area

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
108 Bruach Na Laoi, Union Quay, CorkJun 2025€245,000168 m
Apt 2, 19 Maylor St, Acra HouseMay 2025€690,000170 m
9 Morrison House, Morrisons Quay, CorkJul 2026€250,000182 m
Apt 7, Quay House, Fitton StFeb 2025€322,000202 m
Apt 14, Quay House, Fitton StDec 2025€236,000202 m
11 Quay House, Fitton St, CorkNov 2025€346,500202 m
27 Lower Oliver Plunkett Street, Cork City, Co. CorkJun 2026€230,000244 m
7 Anglesea Villas, Anglesea St, CorkApr 2026€450,000302 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 December 2016
  2. Decision due25 April 2017
  3. Decision issued25 April 2017
  4. Grant issued26 May 2017

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.