Planning Permission Ireland
GrantedCommercialDecided 14 September 2020

Former Moores Hotel site including, 9-14 Morrisons Quay 5 & 5A Fitton Street, 1 Keeffe Street and adjoining lands backing

Demolition of buildings to construct a 187-bedroom hotel and offices, incorporating three protected structures.

2039418 · Cork City Council · Lodged 21 July 2020

Reference
2039418
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
21 July 2020

Summary

AI-generated

This major development proposes the demolition of over 2,116 sqm of existing buildings and the conservation of three protected structures for office use. A new 4 to 5 storey mixed-use building will be constructed to house a 187-bedroom hotel and additional office space.

Commercialhotelofficeheritagedemolition
Storeys
5
Floor area
6,832 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission... For the demolition of c. 2116.76 sqm of existing buildings. The conservation, modification and restoration of the 3 no. Protected structures, no. 11, 12 and 13 morrison’s quay to accommodate 3 new own door office buildings. To the north, south and west of the 3 protected structures a new build 4 to 5 storey mixed use development comprising office and hotel development is proposed containing 187 hotel bedrooms, seating areas and ancillary restaurant, public bar, kitchen, hotel areas/offices, associated staff areas, changing/shower rooms, toilets, stores, bin and bicycle stores, stair/lift cores and circulation throughout, along with a courtyard at ground floor level and plant at ground level and roof level. The gross floor area of the hotel will be c. 6831.8sqm. The ground floor of the new building fronting onto catherine street will be an office development , with hotel rooms above. There will be pedestrian accesses the offices from morrisons quay and catherine street and to the hotel from morrisons quay and keeffe street. Permission is also sought for lighting and signage and a small basement for a water tank along with water attenuation all other site development and site services works as required to enable the development of the site. The existing buildings no's. 11, 12 and 13 morrisons quay are protected structures. A natura impact statement... Will be submitted/furnished to the local authority in respect of this planning application.

Land-use zoning

What this land is zoned for

City CentreUC
To consolidate and facilitate the development of the central area and to promote its role as a dynamic mixed used centre for community, economic, civic, cultural and residential growth.

National zoning type: City/Town/village Centre, central area

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 14, Quay House, Fitton StDec 2025€236,00046 m
Apt 7, Quay House, Fitton StFeb 2025€322,00046 m
11 Quay House, Fitton St, CorkNov 2025€346,50046 m
9 Morrison House, Morrisons Quay, CorkJul 2026€250,00047 m
108 Bruach Na Laoi, Union Quay, CorkJun 2025€245,000140 m
Apt 3, 18 Georges Quay, CorkDec 2025€138,250200 m
Apt 4, 18 Georges Quay CorkDec 2025€138,250200 m
Apt 1, 18 Georges Quay CorkDec 2025€138,250200 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received21 July 2020
  2. Decision due14 September 2020
  3. Decision issued14 September 2020
  4. Grant issued3 November 2020
  5. Appeal submitted8 October 2020
  6. Appeal decided28 October 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.