CROCKAHENNY, LEAMACROSSAN HILL, INISHOWEN LIFFORD PO
Construction of two wind turbines up to 135 metres tall at Crockahenny Windfarm.
2561856 · Donegal County Council · Lodged 24 October 2025
- Reference
- 2561856
- Authority
- Donegal County Council
- Register status
- Invalid or incomplete
- Type
- PERMISSION
- Received
- 24 October 2025
Summary
AI-generatedThis is a 10-year planning permission application for two wind turbines with a blade tip height of up to 135 metres. It includes a new 38 kV electrical substation to replace the existing one, access track extensions, and underground cabling.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
A 10-year planning permission for the construction of two wind turbines within the landholding of the crockahenny windfarm and all associated works including two wind turbines that will have an overall blade tip height of up to 135 metres; site works including the construction of wind turbine foundations, turbine hard standings and assembly areas with associated drainage; a proposed 38 kv electrical substation to replace the existing electrical substation and continued use of the existing electrical compound; two extensions of the existing access tracks within the site; installation of underground electrical cable in existing electrical ducts and all associated site development and ancillary works. The proposed wind turbines will connect to the proposed substation and will avail of the existing tracks and entrance. The proposed development will have a 30 year operational life from the date of commissioning. The development is covered by the provisions of the (red iii) renewable energy directive iii (directive 2023/2413)
Key dates
Timeline
- Application received24 October 2025
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
A 10-YEAR PLANNING PERMISSION FOR THE CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE…
CROCKAHENNY , LEAMACROSSAN HILL , INISHOWEN
2562117DonegalLodged 2 Dec 2025Energy
- Granted120 m away
CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY WIND FARM. THE PROPOSED…
CROCKAHENNY , LEAMACROSSAN HILL , INISHOWEN
2560337DonegalLodged 11 Mar 2025Energy
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
A 10-YEAR PLANNING PERMISSION FOR THE CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE…
CROCKAHENNY , LEAMACROSSAN HILL , INISHOWEN
2562117DonegalLodged 2 Dec 2025
- GrantedEnergy
CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY WIND FARM. THE PROPOSED…
CROCKAHENNY , LEAMACROSSAN HILL , INISHOWEN
2560337DonegalLodged 11 Mar 2025
- Awaiting decisionEnergy
10 YEAR PLANNING PERMISSION AND A 30 YEAR OPERATIONAL LIFE FOR THE DEVELOPMENT. THE DEVELOPMENT OF A WIND…
CROAGHNASHALLOG , DONEGAL PO , CO. DONEGAL
2561652DonegalLodged 24 Sept 2025
- Awaiting decisionEnergy
A 10 YEAR PLANNING PERMISSION FOR A LONG DURATION ENERGY STORAGE FACILITY CONSISTING OF: INSTALLATION AND…
CROCKAHENNY , INISHOWEN , CO. DONEGAL
2660496DonegalLodged 24 Mar 2026
- RefusedEnergy
A TEN YEAR PLANNING PERMISSION FOR A RENEWABLE ENERGY DEVELOPMENT WITH A 40-YEAR OPERATIONAL LIFE FROM THE…
MASSLOUGHDERRYDUFF LACKAGHATERMON , ARDARA , DONEGAL PO
2251393DonegalLodged 19 Aug 2022
- Awaiting decisionEnergy
A 10 YEAR PLANNING PERMISSION WITH A 35 YEAR OPERATIONAL LIFESPAN FOR DEVELOPMENT OF THE FOLLOWING: (1)…
CROCKAHENNY , INISHOWEN , CO. DONEGAL
2660373DonegalLodged 10 Mar 2026
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.