CROAGHNASHALLOG, DONEGAL PO, CO. DONEGAL
Construction of a five-turbine wind farm with an overall tip height of 86 metres.
2561652 · Donegal County Council · Lodged 24 September 2025
- Reference
- 2561652
- Authority
- Donegal County Council
- Register status
- Withdrawn
- Type
- PERMISSION
- Received
- 24 September 2025
Summary
AI-generatedThe application seeks a 10-year planning permission and 30-year operational life for a wind farm consisting of five wind turbines with a total capacity of 4.99MW and a tip height of 86m. The development also includes an onsite substation, access tracks, and a temporary construction compound, accompanied by a Natura Impact Statement.
- Storey
- 1
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
10 year planning permission and a 30 year operational life for the development. The development of a wind farm consisting of (1) erection of (a) five wind turbines of a total capacity of 4.99mw, of a total overall tip height of 86m (b) an onsite medium voltage (mv) substation (c) a temporary construction compound, (d) site signage (2) provision of a site entrance, (3) installation of underground cabling connecting the turbines, (4) associated site access tracks, and all ancillary site development works. A natura impact statement (nis) accompanies this application. The development is covered by the provisions of the (red iii) renewable energy directive iii (directive 2023/2413)
Key dates
Timeline
- Application received24 September 2025
- Decision due6 November 2026
- Application withdrawn10 December 2025
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Awaiting decision90 m away
10 YEAR PLANNING PERMISSION AND A 35 YEAR OPERATIONAL LIFE FOR THE INSTALLATION AND OPERATION OF FIVE (5)…
CROAGHNASHALLOG , DUNGLOE , LETTERKENNY PO
2660692DonegalLodged 21 Apr 2026Energy
- Awaiting decision90 m away
10 YEAR PLANNING PERMISSION AND A 35 YEAR OPERATIONAL LIFE FOR THE INSTALLATION AND OPERATION OF FIVE (5)…
CROAGHNASHALLOG , DUNGLE , LETTERKENNY PO
2660660DonegalLodged 16 Apr 2026Energy
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- RefusedEnergy
A TEN YEAR PLANNING PERMISSION FOR A RENEWABLE ENERGY DEVELOPMENT WITH A 40-YEAR OPERATIONAL LIFE FROM THE…
MASSLOUGHDERRYDUFF LACKAGHATERMON , ARDARA , DONEGAL PO
2251393DonegalLodged 19 Aug 2022
- RefusedEnergy
A TEN YEAR PLANNING PERMISSION FOR A WIND FARM WITH A 30 YEAR OPERATIONAL LIFE (FROM THE DATE OF…
MOMEEN & LETTERGULL , CO. DONEGAL
1850156DonegalLodged 7 Feb 2018
- Awaiting decisionEnergy
10 YEAR PLANNING PERMISSION AND A 35 YEAR OPERATIONAL LIFE FOR THE INSTALLATION AND OPERATION OF FIVE (5)…
CROAGHNASHALLOG , DUNGLE , LETTERKENNY PO
2660660DonegalLodged 16 Apr 2026
- GrantedEnergy
(1) REMOVAL OF THE EXISTING 8 NO. 600 AND 660 KILOWATT (KW) TURBINES AND REPLACEMENT WITH 3 NO. 4.5 MEGAWATT…
MEENDERRYGAMPH , GWEEDORE , CO. DONEGAL
2250813DonegalLodged 11 May 2022
- Awaiting decisionEnergy
A 10-YEAR PLANNING PERMISSION FOR THE CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE…
CROCKAHENNY , LEAMACROSSAN HILL , INISHOWEN LIFFORD PO
2561856DonegalLodged 24 Oct 2025
- Awaiting decisionEnergy
A TEN YEAR PLANNING PERMISSION WHICH WILL CONSIST OF 2 NO. WIND TURBINES WITH TIP HEIGHT OF UP TO 110M (EACH…
MEENHORE , GROUSEHALL , DONEGAL PO
1650040DonegalLodged 21 Jan 2016
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.