Planning Permission Ireland
RefusedEnergyDecided 13 October 2022

MASSLOUGHDERRYDUFF LACKAGHATERMON, ARDARA, DONEGAL PO

Construction of a three-turbine wind farm with a maximum tip height of 150 metres and associated infrastructure near Ardara.

2251393 · Donegal County Council · Lodged 19 August 2022

Reference
2251393
Authority
Donegal County Council
Register status
Decided
Type
PERMISSION
Received
19 August 2022

Summary

AI-generated

The development consists of three wind turbine generators with a maximum tip height of 150 metres and associated hardstands. It includes upgrading existing site tracks, widening site entrances and public road bends, and constructing a control building, substation, and temporary site compound.

Energywind energyrenewablesinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A ten year planning permission for a renewable energy development with a 40-year operational life from the date of commissioning. The development will consists of (1) construction of 3 wind turbine generators and associated hardstands areas within the following parameters (a) a total tip height in the range of 145 metres minimum to 150 metres maximum (b) hub height in the range of 82 metres minimum to 87 metres maximum (c) rotor diameter in the range of 121 metres minimum to 126 metres maximum (2) upgrading of existing site access tracks and roads and provision of new site access track and roads (3) widening of 3 no. Existing site entrances and provision of a new site entrance (4) widening of 4 no. Bends and 1 no. Junction along the public road l2563 (5) construction of (a) a control building / substation with a fenced compound previously permitted under planning reference 14/50553 and extended under planning application reference 19/51227 (b) a new temporary site compound for use during construction (6) site drainage network (7) installation of internal wind farm underground power and communications cabling (7) all associated site development and ancillary works. A environmental impact accessment report (eiar) and natura impact statement accompany this application

Key dates

Timeline

  1. Application received19 August 2022
  2. Decision due13 October 2022
  3. Decision issued13 October 2022
  4. Appeal submitted9 November 2022
  5. Appeal decided18 September 2023
  6. Permission expiry17 September 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.