Planning Permission Ireland
Awaiting decisionEnergy

CROCKAHENNY, INISHOWEN, CO. DONEGAL

A 10-year planning permission for a battery energy storage facility in Inishowen.

2660441 · Donegal County Council · Lodged 18 March 2026

Reference
2660441
Authority
Donegal County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
18 March 2026

Summary

AI-generated

This application is for a long-duration battery energy storage system compound with an operational lifespan of 35 years. The development includes battery containers, an electrical substation, a 50m underground grid connection, transformers, and associated site works on a 0.54-hectare site.

Energyenergybatteryinfrastructure
Floor area
5,400 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A 10 year planning permission for a long duration energy storage facility consisting of: installation and operation of 1 no. Battery energy storage system compound containing battery energy storage containers, 1 no. Electrical substation and compound, connection to the national grid system via 50m of underground cable to the esb crockahenny 38kv substation, electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, cctv, internal access road, associated ancillary site development, landscaping and reinstatement works. The operational lifespan of the development will be 35 years and the site of the proposed development has a total area of c. 0.54 hectares. The development is covered by the provisions of the (red iii) renewable energy directive iii (directive (eu) 2023/2413)

Key dates

Timeline

  1. Application received18 March 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.