Planning Permission Ireland
Part granted, part refusedAlterationsDecided 19 June 2024

Embassy of United Arab Emirates 45-47, Pembroke Road, Dublin 4

Renovations, internal layout changes, and solar panels at the UAE Embassy.

0183/24 · Dublin City Council · Lodged 22 May 2024

Reference
0183/24
Authority
Dublin City Council
Register status
Decided
Received
22 May 2024

Summary

AI-generated

A declaration is sought on whether extensive renovations to the embassy are exempt from planning permission. Works include internal room layout changes, replacement of windows and doors, a new flat roof with a partial green roof, solar panels, and new roof-mounted plant equipment.

Alterationsembassysolarrenovationexpp

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Expp: this section 5 application has been prepared in order to determine whether changes to the internal layout, replacement of existing fenestration and doors to the rear and sides, roofing, solar panels, plant and general renovations are exempt from a requirement for planning permission to include
  • Fitting out of all internal rooms at basement, lower ground floor, upper ground floor, first floor and second floor including new room layouts, new internal finishes, new services and plant installations
  • Replace existing windows and doors to the rear and sides with new aluminium windows and doors
  • New insulated flat roof covering to the rear flat roof and rear fire escape roof, sedum green roof to part of flat roof, solar panels, finishes suitable for foot traffic along the fire escape and maintenance routes and pressed metal capping to the rear flat roof perimeter
  • Replace existing fibre cement slates with new blue bangor natural slates to the front pitched roof
  • Replace existing roof mounted plant and services equipment with new roof mounted plant and services equipment to service the new room layouts, none of which will be visible from the front elevation

Key dates

Timeline

  1. Application received22 May 2024
  2. Decision due19 June 2024
  3. Decision issued19 June 2024

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.