WithdrawnRetentionDecided 17 January 2019

11, Sherrard Street Lower, Dublin 1

Retention and completion of internal upgrade works to a protected structure on Sherrard Street Lower.

2043/18 · Dublin City Council · Lodged 10 January 2018

Reference
2043/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
10 January 2018

Summary

AI-generated

Retention permission is sought for unauthorised works previously carried out, alongside permission to complete them. The works to this protected structure include heating and electrical upgrades, dry lining, fire safety upgrades, new bathrooms, kitchenettes, and fire doors.

Retentionprotected structurerefurbishmentretention

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: retention: the development seeks retention permission for unauthorised works which were previously carried out, and permission is now also sought to complete these works. The works consist of upgrade works to the heating system and electrics to current standards, installation of insulated dry lining, fire safety upgrades, installation of new kitchenettes to replace previously removed kitchenettes, construction of new bathrooms, installation of new fire doors, and other minor internal alterations.

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
18 Portland Square, North Circular Road, Dublin 1Sept 2025€372,00041 m
25 Sherrard Ave, Dublin 1Jul 2025€328,00042 m
5 Sherrard Ave, North Circular Rd, Dublin 1Mar 2025€325,00065 m
23 Belvidere Ave, North Circular Rd, Dublin 1Dec 2025€650,00075 m
9 Sherrard Ave, North Circular Rd, Dublin 1Oct 2025€310,00078 m
31 Belvedere Rd, Dublin 1, DublinSept 2025€540,000104 m
16 Portland St, Dublin 1, DublinMar 2026€875,000109 m
40 Portland Lock, Portland Place, Dublin 1Sept 2025€256,000112 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received10 January 2018
  2. Further information requested6 March 2018
  3. Decision due6 February 2018
  4. Decision issued17 January 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.