Planning Permission Ireland
GrantedAlterationsDecided 29 July 2021

17a New Bride Street, Dublin 8

Amendments to a permitted development at a protected structure, including toilet relocation and roof works.

2906/21 · Dublin City Council · Lodged 4 June 2021

Reference
2906/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
4 June 2021

Summary

AI-generated

The development consists of amendments to a previously permitted scheme. Works include relocating the ground floor toilet core to the basement, expanding the ground floor studio, demolishing and rebuilding a tea station roof, and facade amendments.

Alterationsheritagestudioamendment

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: the development will consist of amendments to the permitted development under application no. 3522/20 comprising: the relocation of the ground floor toilet core to the basement, the expansion of the ground floor open plan studio, the demolition of the existing 20th century tea station roof frl 16.925m and construction of a new tea station roof frl 17.670m, amendments to chill zone facade to facilitate dac access, reconfiguration and omission of 3no. Roof lights to the single storey flat roof and the provision of secondary floor access to flat roof for fire escape purposes

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 25 November 2021. A completion certificate was lodged on 22 January 2024.

Notified floor area: 320

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
16 Long Lane, Dublin 8, DublinJan 2025€645,00025 m
13 St Kevins Terrace, New Bride St, Dublin 8Aug 2025€535,00047 m
24 Long Lane, Dublin 8, DublinJun 2025€660,00064 m
5 Fernley Court, Long Lane, Dublin 8Jan 2026€490,00095 m
48 Arnott St, Dublin 8, DublinMar 2026€955,000101 m
14 Fernley Court, Long Lane, Dublin 8Dec 2025€495,000101 m
17 Fernley Court, Long Lane, Dublin 8Dec 2025€490,000104 m
18 Fernley Court, Long Lane, Dublin 8May 2026€292,500104 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received4 June 2021
  2. Decision due29 July 2021
  3. Decision issued29 July 2021
  4. Grant issued10 September 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.