Planning Permission Ireland
InvalidRetentionDecided 11 June 2018

The Culvert Apartments, 7/7A, Pim Street (corner with Forbes Lane), Dublin 8

Retention of modifications to a built 3-6 storey mixed-use development.

3095/18 · Dublin City Council · Lodged 24 May 2018

Reference
3095/18
Authority
Dublin City Council
Register status
Decided
Type
Retention Permission
Received
24 May 2018

Summary

AI-generated

Retention permission is sought for various modifications made during the construction of a 3-6 storey mixed-use development. The built development contains 27 residential units, a two-storey commercial office, and 8 car parking spaces.

Retentionapartmentsretentionmixed use
Residential units
27
Storeys
6

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Retention: the application seeks the retention of various modifications to the development that was permitted under planning register reference 2048/04. The development, built on site, comprises a 3-6 storey mixed use development including 27 no. Residential units (4 no. Duplex units and 23 no. Apartments in a mix of 7 no. 1 bed units, 18 no. 2 bed units and 2 no. 3 bed units), a 2 storey commercial office (c. 66.8 sqm) at ground and first floor level facing onto pim street, 8 no. Car parking spaces, all apartments / duplexes have associated balconies. Retention permission is sought for the combined changes to the original permission which result in the existing built form and development at this location.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
11 Pim St, Dublin 8Aug 2025€420,00049 m
19 Longs Place, Rialto, Dublin 8May 2025€350,00054 m
13 Longs Place, Longs Lane, Dublin 8Jul 2025€2,490,00074 m
6 The Granery, Pim St, Dublin 8Feb 2025€296,00081 m
Apt 14 The Granary, Longs Place, Dublin 8Dec 2025€320,00081 m
3 Newport St, Off James St, Dublin 8Apr 2025€350,000102 m
94 The Malthouse, Marrowbone Lane, Dublin 8Jun 2026€401,000102 m
62 The Malthouse, Marrowbone Lane, Dublin 8Feb 2025€320,000117 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 May 2018
  2. Decision due18 July 2018
  3. Decision issued11 June 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.