GrantedApartmentsDecided 2 December 2021

6, 6A and 7, Pim Street, Dublin 8

Modifications to a previously approved development of 29 apartments.

3662/21 · Dublin City Council · Lodged 8 October 2021

Reference
3662/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
8 October 2021

Summary

AI-generated

The applicant seeks modifications to an approved 29-apartment scheme. Changes include reconfiguring the main stairs, lift core, and corridors to comply with building regulations, resulting in a revised unit mix and alterations to the building footprint and elevations.

Apartmentsmodificationsapartments
Residential units
29

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission is sought by pames developments limited for modifications to a previously approved development, register reference 2290/19 for 29 apartments at 6, 6a & 7 pim street, dublin
  • The proposed modifications comprise the following
  • Reconfiguration of the main internal stairs, lift core and common access corridors together with the removal of the second stairs from the rear courtyard to the first floor and consequent reconfiguration of the apartment layouts. These modifications are necessary to achieve compliance with part b fire and part m access of the second schedule of the building regulations. Whilst there is no increase in the overall number of units, the modified scheme will provide a revised mix of 9 studio apartments (previously 10 studio apartments), 14 one- bedroom apartments (previously 13 one-bedroom apartments), and 6 two- bedroom apartments (no change)
  • Resultant alterations to the elevations arising from the modifications noted in item 1 above to include extending the building footprint to the site boundary at the back of the pim street public footpath over the full width of the site
  • Provision of a railed enclosure of minimum 1.0m height to enclose the private amenity space provided for the two ground floor apartments on to pim street and provision of a 1.8m high privacy screen to the penthouse roof garden to apartment number 27.4. Redesign of the cycle parking compound and bin store in the rear courtyard
  • Permission to omit the requirement at condition 7(c) of planning permission 2290/19 to provide shower and changing facilities in the cycle storage area

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 22 February 2022. A completion certificate was lodged on 9 April 2024.

Notified floor area: 1,937.2

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
11 Pim St, Dublin 8Aug 2025€420,00035 m
19 Longs Place, Rialto, Dublin 8May 2025€350,00058 m
6 The Granery, Pim St, Dublin 8Feb 2025€296,00061 m
Apt 14 The Granary, Longs Place, Dublin 8Dec 2025€320,00061 m
13 Longs Place, Longs Lane, Dublin 8Jul 2025€2,490,00062 m
3 Newport St, Off James St, Dublin 8Apr 2025€350,00075 m
32 Liberty View, Longs Place, Dublin 8Jan 2025€255,000108 m
Apt 26 Liberty View, Pim St, Dublin 8Mar 2025€170,000108 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 October 2021
  2. Decision due2 December 2021
  3. Decision issued2 December 2021
  4. Grant issued14 January 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.