Planning Permission Ireland
RefusedNew dwellingDecided 15 April 2024

1(b), Grantham Place, to the rear of 45 Harrington Street, Dublin 8. The site includes part of the rear return of 45 Harrington Street, a Protected Structure.

Demolition of an extension and construction of a new three-storey, three-bedroom house.

3245/24 · Dublin City Council · Lodged 21 February 2024

Reference
3245/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
21 February 2024

Summary

AI-generated

The project involves the demolition of an existing single-storey extension to the rear of a protected structure. A new three-storey, three-bedroom dwelling house will be constructed onto Grantham Place, featuring a first-floor balcony and a second-floor roof garden.

New dwellingnew housedemolitionprotected structureinfill
Residential unit
1
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure: the development will consist of
  • Demolition of existing single storey extension and blocking up of existing windows in the rear return of 45 harrington street
  • Construction of a new three storey, 3-bedroom dwelling house onto grantham place with ground floor yard balcony at first floor level and a roof garden at second floor level; &
  • All associated site works and services

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 27 December 2024.

Notified floor area: 100

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
3 Grantham Place, Harrington St, Dublin 8Oct 2025€287,50039 m
3a Grantham Place, Harrington St, Dublin 8Oct 2025€287,50041 m
9 Grantham Place, South Circular Rd, Dublin 8Dec 2025€600,00049 m
38 Synge St, Dublin 8, DublinNov 2025€1,720,00076 m
12a Synge Place, Dublin 8Sept 2025€725,00077 m
Hall Floor, 34 Synge St, Dublin 8Feb 2026€1,795,000118 m
17a Synge St, Portobello, Dublin 8Jul 2025€635,000120 m
6 Harcourt Hall, Charlotte Way, Dublin 2Jan 2025€386,000132 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received21 February 2024
  2. Decision due16 April 2024
  3. Decision issued15 April 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.