BELLACORICK, BALLINA, CO. MAYO

A 3 MW battery storage facility with electrical plant and masts in Ballina.

18190 · Mayo County Council · Lodged 22 March 2018

Reference
18190
Authority
Mayo County Council
Register status
Decided
Type
PERMISSION
Received
22 March 2018

Summary

AI-generated

The development consists of a 3 MW capacity battery storage facility including 2 battery storage containers, a single-storey electrical control room, and ancillary electrical plant. It also features a 15.5m high lightning mast, an 18m high communications mast, and a 100m long access road connecting to the existing substation.

Energybattery storageenergyinfrastructure
Storey
1
Floor area
77 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A c. 3 mw capacity battery storage facility and will - subject to detailed design, commerical and technical considerations include: 2 no. Battery storage containers (up to 16.6m x 2.9m x 3.7m high) a single-storey electrical control room (c. 77sqm), ancillary electrical plant including 5 no. Transformers, inverters and other containerised plant, a c. 15.5m high lightning mast and c. 18m high scada communications mast, c. 2.6m high boundary fence and access gate, c. 100m long access road connecting with the existing substation access road and ancillary site works including the installaton of site services

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Bellacorick, Ballina, MayoMay 2026€144,000222 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 March 2018
  2. Decision due16 May 2018
  3. Decision issued14 May 2018
  4. Grant issued18 June 2018
  5. Permission expiry17 June 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.