Planning Permission Ireland
GrantedApartmentsDecided 23 February 2021

17-21, Church Street East, East Wall, Dublin 3

Demolition of a two-storey industrial building to construct a four and five-storey block of 9 apartments.

3409/20 · Dublin City Council · Lodged 18 September 2020

Reference
3409/20
Authority
Dublin City Council
Register status
Appealed
Type
Permission
Received
18 September 2020

Summary

AI-generated

The proposed development at Church Street East consists of demolishing an existing 331 sq m industrial/office building. In its place, a 4 and 5-storey apartment block will be built, containing 1 studio, 5 one-bedroom, and 3 two-bedroom apartments.

Apartmentsapartmentsdemolitionredevelopment
Residential units
9
Storeys
5
Floor area
772 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed development consists of the demolition of an existing 2 storey industrial/office building (331 sq m) and the construction of a 4 and 5 story block of apartments totalling 772 sq m (including roof garden) on a site of 267 sq m consisting of 1 no. Studio apartment; 5 no. 1 bedroom apartments; 3 no. 2 bedroom apartments; balconies on the rear elevation at 1st to 4th floor levels; 18 no bicycle spaces; all associated site works and utility connections.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
4 Church St East, East Wall, Dublin 3Jan 2025€525,00024 m
20 Abercorn Rd, Dublin 3, DublinMay 2025€294,00029 m
10 Church St East, East Wall, Dublin 3Mar 2026€400,00035 m
28 Canon Hall, Church St East, Dublin 3May 2026€345,00049 m
6 Canon Hall, Church St East, Dublin 3May 2025€320,00049 m
32 Canon Hall, Church St East, Dublin 3Jun 2025€338,00049 m
Apt 13 Canon Hall, Church St East, Dublin 3Apr 2026€531,75049 m
1 Church Row, East Wall, Dublin 1Jun 2026€396,00054 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received18 September 2020
  2. Further information requested11 November 2020
  3. Further information received26 January 2021
  4. Decision due22 February 2021
  5. Decision issued23 February 2021
  6. Grant issued12 October 2021
  7. Appeal submitted23 March 2021
  8. Appeal decided12 October 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.