Planning Permission Ireland
GrantedExtensionDecided 7 December 2020

8, Brighton Square, Rathgar, Dublin 6, D06 W560

Demolition of a lean-to and sheds to build new ground and first-floor extensions to the rear of the house.

3565/20 · Dublin City Council · Lodged 15 October 2020

Reference
3565/20
Authority
Dublin City Council
Register status
Appealed
Type
Permission
Received
15 October 2020

Summary

AI-generated

The development consists of demolishing an existing single-storey breakfast area and two garden sheds. In their place, a new ground-floor breakfast area, study/bedroom, and link corridor will be built, alongside a first-floor bedroom extension with an en-suite.

Extensiondemolitionrear extension

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of the demolition of the existing lean-to single storey breakfast/dining area (4.9sqm) to the existing kitchen at the rear return of the house, and the demolition of the two existing stone and slate lean-to back garden sheds, (totalling 5.06sqm), apart from the party walls to same. The development will consist of the construction of a new breakfast/dining area of 11.29sqm incorporating the existing lean-to area in the return; a new study/bedroom area of 18.60sqm including an en-suite toilet area and a link from the new breakfast/dining area to the study/bedroom area, totalling 7.11sqm all at ground floor level. The bedroom in the rear return area over the existing kitchen area is to be extended by 9.82sqm and is to include an en-suite toilet area. The development is to include roof lights, associated site works and other sundry works.

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
5 Brighton Sq, Rathgar, Dublin 6Aug 2025€1,435,00031 m
82 Garville Avenue, Rathgar, Dublin 6Feb 2026€1,855,00053 m
Angle View, 14c Brighton Ave, Rathgar Dublin 6Jun 2025€920,00098 m
12 Rathgar Villas, Rathgar, DublinNov 2025€916,500112 m
Apt 1, 27 Rathgar Ave, Rathgar Dublin 6Jul 2025€1,850,000127 m
12 Harmac Court, Brighton Ave, Rathgar Dublin 6Mar 2025€355,000128 m
47 Garville Ave, Rathgar, Dublin 6Jul 2025€2,620,000128 m
56 Garville Ave, Dublin 6, DublinApr 2026€1,200,000132 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received15 October 2020
  2. Decision due9 December 2020
  3. Decision issued7 December 2020
  4. Grant issued29 April 2021
  5. Appeal submitted8 January 2021
  6. Appeal decided29 April 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.