Planning Permission Ireland
GrantedChange of useDecided 12 June 2023

52, Richmond Street South, Dublin 2

Change of use from a café to a restaurant at the basement and ground floor of a protected structure on Richmond Street South.

3582/23 · Dublin City Council · Lodged 18 April 2023

Reference
3582/23
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
18 April 2023

Summary

AI-generated

The development consists of changing the use of the basement and ground floor of No. 52 Richmond Street South from a café to a 184.7 sqm restaurant. The proposal includes internal alterations, new signage on the front elevation, and associated conservation works to the protected structure.

Change of userestaurantconservationcafe
Floor area
185 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: permission: the development will consist of change of use of the basement and ground floor of no. 52 richmond street south from café with ancillary storage to a restaurant of 184.7sqm that will be open between 07.00 and 23.00hours and will be accessed over the permitted platform and entrance from the street to the front. New signage (1.55sqm) at ground floor of the front elevation addressing richmond street south. Internal alterations and modifications at basement and ground floor level of the property. All associated conservation and site development works.

Land-use zoning

What this land is zoned for

Z4: Key Urban Villages/Urban VillagesDC
To provide for and improve mixed-services facilities.

National zoning type: District, neighbourhood centre

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 10 January 2020. A completion certificate was lodged on 1 March 2021.

Notified floor area: 444

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
12a Synge Place, Dublin 8Sept 2025€725,00069 m
Apt 1, 16 Lennox St, Dublin 8Sept 2025€1,000,00069 m
42b South Richmond St, Dublin 2, DublinApr 2026€90,00086 m
Hall Floor, 34 Synge St, Dublin 8Feb 2026€1,795,000109 m
Apt 7, Portobello Dock, Portobello HarbourJun 2025€295,000127 m
Apt 17 Portobello Dock, Portobello Harbour, Dublin 8Mar 2025€410,000127 m
23 Portobello Dock, Portobello Harbour, Dublin 8Aug 2025€514,000127 m
14 Portobello Dock, Portobello Harbour, Dublin 8Jun 2025€352,000127 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received18 April 2023
  2. Decision due12 June 2023
  3. Decision issued12 June 2023
  4. Permission expiry2 September 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.