Planning Permission Ireland
GrantedChange of useDecided 10 March 2021

19 Upper Baggot Street, Saint Peter's, Dublin 4. D04 E271

Change of use from café to restaurant, two-storey rear extension, and upgrades to a protected structure on Upper Baggot Street.

3018/20 · Dublin City Council · Lodged 15 July 2020

Reference
3018/20
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
15 July 2020

Summary

AI-generated

The development at this protected structure includes a change of use from a café to a restaurant on the ground and basement levels. It also features a new two-storey rear extension, fire safety upgrades, internal partition removals, and shopfront upgrades.

Change of useprotected structurerestaurantextension
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: the development will consist of: a) change of use from café to restaurant on the ground floor and basement level; b) fire safety upgrades with introduction of fire lobbies at ground floor and basement level; c) new opening at basement level to rear of building in location of existing non-original window, new opening at ground floor to rear of building replacing existing window with opening similar in dimensions to window above, removal of non-original windows in annex and openings modified to be used for pedestrian access/circulation; d) proposed two storey extension to rear of existing building for restaurant use with glazed roof section connecting new extension to existing structure and; e) upgrade of existing shop front at ground floor level; f) removal of non-original partitions internally to accommodate revised layout.

Land-use zoning

What this land is zoned for

Z4: Key Urban Villages/Urban VillagesDC
To provide for and improve mixed-services facilities.

National zoning type: District, neighbourhood centre

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
29 Haddington Rd, Dublin 4, DublinJun 2025€1,640,000132 m
7 Pembroke Rd, Dublin 4, DublinDec 2025€2,250,000144 m
12 Eastmoreland Place, Dublin 4Dec 2025€650,000176 m
Apt 1, Arranmore, 13-17 Pembroke RoadNov 2025€455,000178 m
24 Eastmoreland Court, Eastmoreland Place, Dublin 4Jun 2025€325,000188 m
42 Eastmoreland Court, Ballsbridge, Dublin 4Feb 2025€540,000188 m
Apt 7, 2 Waterloo Rd, Dublin 4Nov 2025€300,000201 m
12 Baggot Lane, Dublin 4, DublinMay 2025€970,000205 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received15 July 2020
  2. Further information requested8 September 2020
  3. Further information received11 February 2021
  4. Decision due10 March 2021
  5. Decision issued10 March 2021
  6. Grant issued27 April 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.