Planning Permission Ireland
GrantedIndustrialDecided 13 July 2022

Site at Clonshaugh Business and Technology Park, Dublin 17. The subject site (with an area of c. 3.75 ha) comprises the site of former Units 15 and 16 (previously demolished) and the former Ricoh Building. The site is located, to the north of the Santry

Demolition of an existing building and construction of two data centre buildings in Clonshaugh.

3641/21 · Dublin City Council · Lodged 6 October 2021

Reference
3641/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
6 October 2021

Summary

AI-generated

The development involves the demolition of the former Ricoh building and associated site clearance. It proposes the construction of two data centre buildings over two storeys, with a combined gross floor area of approximately 14,330 square metres, including roof-level plant.

Industrialdata centredemolitionindustrial
Storeys
2
Floor area
14,330 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development on a site at clonshaugh business and technology park, dublin
  • The subject site (with an area of c. 3.75 ha) comprises the site of former units 15 and 16 (previously demolished) and the former ricoh building. The site is located to the north of the santry river and the r104 oscar traynor road, to the west of clonshaugh road, and to the south and east of existing estate roads. The proposed development, for which a seven-year permission is sought, comprises the following: -demolition of the existing former ricoh building, and all other associated site clearance works including removal of existing site services and esb pillar boxes (other buildings previously occupying the site were demolished under reg. Ref: 2229/19, a previously permitted data centre development, as amended by reg. Ref:3200/20); -construction of two data centre buildings (data centre a and data centre b), with a gross floor area (gfa) of c. 12,875 sq. M and c. 1,455 sq. M respectively, each over two storeys (with data centre a also including two mezzanine levels), with plant at roof level; -data centre a will be located in the northern portion of the site, with a parapet height of c. 19.8 metres and will accommodate data halls, associated electrical and mechanical plant rooms, a loading bay, maintenance and storage space, office administration areas, with plant and solar panels at roof level; -data centre b (which will be ancillary to data centre a) will be located to the south of data centre a, with a parapet height of c. 12.8 metres and will accommodate data halls, associated electrical and mechanical plant rooms, a loading bay, maintenance and storage space, office administration areas, with plant at roof level; -emergency generators and associated flues will be provided within compounds adjoining each of the two data centre buildings (11 no. For data centre a and 1 no. For data centre b). -the development includes a diesel tank and a filling area to serve the proposed emergency generators; -ancillary structures including a sprinkler tank and pumphouse, security building, mv building, and provision of two additional mv substation rooms to the existing substation on site (c. 115 sq. M additional gfa), which was previously constructed under reg. Ref. : 2229/19 as amended by reg. Ref. :3200/20. -construction of access arrangements and internal road network and circulation areas, footpaths, provision of car parking (58 no. Spaces) and bicycle parking (24 no. Spaces); and -hard and soft landscaping and planting, lighting, boundary treatments, and all associated and ancillary works including underground foul and storm water drainage network, and utility cables

Land-use zoning

What this land is zoned for

Z4: Key Urban Villages/Urban VillagesDC
To provide for and improve mixed-services facilities.

National zoning type: District, neighbourhood centre

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 14 November 2022. A completion certificate was lodged on 10 May 2024.

Notified floor area: 123

8 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
8 Riverside Park, Clonshaugh, Dublin 17Oct 2025€450,000213 m
65 Hazel Green, Oscar Traynor Woods, Coolockprice excludes VATJul 2026€440,529269 m
62 Hazel Green, Oscar Traynor Woods, Coolock Laneprice excludes VATJun 2026€440,529269 m
53 Hazel Green, Oscar Traynor Woods, Coolockprice excludes VATJun 2026€440,529269 m
13 Riverside Park, Clonsaugh Rd, Dublin 17Sept 2025€502,500271 m
42 Riverside Grove, Clonshaugh, Dublin 17Nov 2025€480,000306 m
38 Riverside Grove, Clonshaugh, DublinAug 2025€442,000307 m
25 Riverside Crescent, Clonshaugh, Dublin 17not full market priceJul 2025€220,000356 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received6 October 2021
  2. Further information requested6 April 2022
  3. Further information received16 June 2022
  4. Decision due13 July 2022
  5. Decision issued13 July 2022
  6. Grant issued24 August 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.