Planning Permission Ireland
GrantedInfrastructureDecided 20 January 2022

Top Oil Yard 1, Promenade Road, Parish of Saint Thomas, Dublin Port, Dublin 3, D03 HK83

Construction of two pipebridges up to 8.5m high to connect industrial yards at Dublin Port.

3671/21 · Dublin City Council · Lodged 11 October 2021

Reference
3671/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
11 October 2021

Summary

AI-generated

The development involves constructing two pipebridges with a maximum height of 8.5m to route new pipework and cables between industrial yards. A small concrete shelter in Fareplay Yard 2 will be dismantled to accommodate the pipebridge supports.

Infrastructureindustrialportinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Planning permission for development at the following adjacent sites: top oil yard 1, promenade road, parish of saint thomas, dublin port, dublin 3, d03 hk83. Top oil yard 2, tolka quay road, dublin port. Circle k yard 2, tolka quay road, dublin port. The sites are adjacent to tolka quay road, promenade road and 2 branch road north extension. The development consists of constructing two pipebridges with a maximum height of 8.5m to allow new pipework and cables to be routed between the yards. Pipebridge no. 1 will be between top oil yard 1 and the neighbouring fareplay yard
  • Pipebridge no. 2 will be between the top oil yard 2 and the neighbouring fareplay yard
  • A small concrete shelter in fareplay yard 2 is to be dismantled to allow room for pipebridge supports

Land-use zoning

What this land is zoned for

Z7: Employment (Heavy)SI
To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.

National zoning type: General industry

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received11 October 2021
  2. Further information requested3 December 2021
  3. Further information received15 December 2021
  4. Decision due20 January 2022
  5. Decision issued20 January 2022
  6. Grant issued3 March 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.