Planning Permission Ireland
GrantedIndustrialDecided 8 January 2021

Fareplay Terminal 2, Road No.2 North Extension, Dublin Port, Dublin 1

Dismantling buildings and upgrading entrance lanes at Dublin Port's Fareplay Terminal 2.

3688/20 · Dublin City Council · Lodged 5 November 2020

Reference
3688/20
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
5 November 2020

Summary

AI-generated

The project involves dismantling a redundant building and repair shop to create two new entrance lanes for commercial loading tankers. It also includes relocating equipment, installing a new 30m3 additive tank, and refurbishing the Vapour Recovery Unit under the Major Accidents Directive.

Industrialdublin portindustrialseveso

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed development consists of dismantling a portion of the terminal 2 site including a redundant building and a repair shop which will allow new entrance gates and associated boundary works to be carried out to accommodate for two entrance lanes for retail commercial loading tankers. Existing equipment including pumps, samples room, lab, and dye tanks will be relocated as part of the works. A new 30m3 additive tank will be provided. The existing vapour recovery unit in terminal 2 will be refurbished. Improved information signage for drivers at entrance and loading gantry will be installed and new internal road markings will be painted to identify parking spaces. The major accidents directive is applicable to the site and as such a significant modification assessment has been completed.

Land-use zoning

What this land is zoned for

Z7: Employment (Heavy)SI
To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.

National zoning type: General industry

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received5 November 2020
  2. Decision due8 January 2021
  3. Decision issued8 January 2021
  4. Grant issued23 February 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.