Planning Permission Ireland
InvalidIndustrialDecided 17 November 2020

Circle K Terminal 1, Alexandra Road, Dublin Port, Dublin 1

Dismantling structures and modifying fuel loading facilities at Circle K Terminal 1 in Dublin Port.

3691/20 · Dublin City Council · Lodged 5 November 2020

Reference
3691/20
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
5 November 2020

Summary

AI-generated

The development involves dismantling a loading gantry, office buildings, workshops, and a control tower. It also includes relocating the Jet Fuel loading gantry, moving equipment to facilitate fuel transfer, and modifying an existing warehouse.

Industrialdublin portindustrialseveso

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed development consists of dismantling a portion of the terminal 1 site including the loading gantry, office buildings, workshops, and control tower. Existing equipment including pumps will be moved to facilitate transfer of fuel to other terminals and bill of lading facilities will be moved as part of the works and the existing warehouse will be modified to store spare parts. The modifications also include relocating the jet fuel loading gantry and installing a new internal entrance gate and fence which is the subject of an exempted development application (see application 0184/20). The major accidents directive is applicable to the site and as such a significant modification assessment has been completed.

Land-use zoning

What this land is zoned for

Z7: Employment (Heavy)SI
To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.

National zoning type: General industry

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received5 November 2020
  2. Decision due8 January 2021
  3. Decision issued17 November 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.