Planning Permission Ireland
InvalidInfrastructureDecided 3 May 2022

RCSI House, 121/122, St. Stephen's Green, Dublin 2, D02 H903

Installation of a new external platform lift and entrance door for disabled access at RCSI House.

3806/22 · Dublin City Council · Lodged 22 April 2022

Reference
3806/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
22 April 2022

Summary

AI-generated

The development consists of the partial demolition of an existing stone-clad planter to insert a new external platform lift. A single facade pane will be replaced with an inward-opening door to facilitate disabled access to the reception area.

Infrastructureaccessibilityliftdemolition

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of the partial demolition of the existing external stone clad planter at street level and the insertion of a new external platform lift to access the ground floor reception area approx. 1880 mm above street level. A single pane of the existing facade will be demolished and replaced with an inward opening door as part of the disabled lift installation. The sides and rear wall of the new opening in the planter will be clad in granite to match the existing planter walls. There will be a new gate and shutter in power-coated metal finish to close off the passenger lift at night.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
1 Prouds Lane, St Stephens Green, Dublin 2May 2026€605,00037 m
12 Cuffe Lane, Cuffe St, Dublin 2Aug 2025€460,000118 m
Apt 12 Russell Court, 95/96 St Stephens Green, Dublin 2Jul 2025€615,000169 m
57 Grafton Hall, Aungier St, Dublin 2price excludes VATDec 2025€287,000240 m
Apartment 2, Sherborne, 26 Aungier StreetMay 2025€274,000245 m
18 Sherborne, Aungier St, Dublin 2Jun 2025€288,000245 m
Apt 9, Sherbourne, Aungier StApr 2025€300,000245 m
38 Wexford St, Apt 1, Dublin 2Feb 2025€800,000285 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 April 2022
  2. Decision due16 June 2022
  3. Decision issued3 May 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.