Planning Permission Ireland
InvalidAlterationsDecided 4 May 2022

98 James's Street, Dublin 8

Upgrades to a protected structure including an automated timber gate, new basement windows, and external air conditioning units.

3819/22 · Dublin City Council · Lodged 26 April 2022

Reference
3819/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
26 April 2022

Summary

AI-generated

The proposed works to this protected structure include upgrading the timber entrance to an automated gate, upgrading the rear escape stairs, and installing a new shower room. It also includes providing four new timber windows at basement level and installing ground-mounted air conditioning units.

Alterationsprotected structureoffice upgradeheritage

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: upgrade of existing timber gated entrance to new automated timber gate fronting james's street. Upgrade of external rear escape stairs including additional handrails. The addition of a new shower room, toilet room alterations and first aid room, the provision of four new timber windows (including reinstatement of one existing blocked-up window ope) to replace existing at basement level. The addition of a security access hatch to an existing internal doorset, at ground floor level. Provision of new ground mounted air conditioning units and associated pipework to be attached to the side (west) and rear (north) facades to serve internal office at third floor and associated areas. And all associated works. The proposal is located within a site which has an approved ie (industrial emissions) licence (ref. No. P0301-04).

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 9, St James'S Court, Echnlin StreetMar 2026€280,000199 m
36 The Maltings, Bonham St, Dublin 8Mar 2026€277,500216 m
48 The Maltings, Bonham St, Dublin 8Apr 2026€280,000216 m
56 The Maltings, Bonham Street, Dublin 8Apr 2025€228,000216 m
25 The Maltings, Bonham Street, Dublin 8May 2025€264,000216 m
136 The Maltings, Bonham St, Dublin 8Dec 2025€273,000237 m
105 The Maltings, Bonham St, Dublin 8Apr 2025€232,000237 m
49 Steevens Gate, James St, Dublin 8Apr 2025€435,000251 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received26 April 2022
  2. Decision due20 June 2022
  3. Decision issued4 May 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.