Planning Permission Ireland
GrantedIndustrialDecided 12 August 2019

site within the St. James's Gate brewery lands bound by James Street to the south, Watling Street to the east and Victoria Quay to the north and adjacent to an internal circulation route (Cooke's Lane)bf

An extension to an existing beer processing plant at the St. James's Gate brewery.

3289/19 · Dublin City Council · Lodged 18 June 2019

Reference
3289/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
18 June 2019

Summary

AI-generated

The development comprises a two-floor metal-clad extension of approximately 180 square metres to an existing beer processing plant. It also includes a new tank with a height of approximately 14.5 metres and all associated site works.

Industrialbreweryindustrialextension
Storeys
2
Floor area
180 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission for development at a site centrally located site within the st. James's gate brewery lands bound by james street to the south, watling street to the east and victoria quay to the north and adjacent to an internal circulation route (cooke's lane). The development comprises an extension to an existing beer processing plant and includes: two-floor (height c. 12m) metal clad extension (c. 180sq. M) with pedestrian / forklift access on the north and west elevations; new tank (height c. 14.5m); and all associated works; all on a site of c. 0.012ha (c. 119.4sq. M. ). The proposed development is located within a site which has an approved ie (industrial emissions) licence (ref no. P0301-04).

Land-use zoning

What this land is zoned for

Z7: Employment (Heavy)SI
To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.

National zoning type: General industry

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 17 October 2019. A completion certificate was lodged on 2 November 2020.

Notified floor area: 182.2

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
25 The Maltings, Bonham Street, Dublin 8May 2025€264,000175 m
36 The Maltings, Bonham St, Dublin 8Mar 2026€277,500175 m
56 The Maltings, Bonham Street, Dublin 8Apr 2025€228,000175 m
48 The Maltings, Bonham St, Dublin 8Apr 2026€280,000175 m
105 The Maltings, Bonham St, Dublin 8Apr 2025€232,000208 m
136 The Maltings, Bonham St, Dublin 8Dec 2025€273,000208 m
Apt 9, St James'S Court, Echnlin StreetMar 2026€280,000234 m
195 The Maltings, Dublin 8, DublinDec 2025€250,000235 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received18 June 2019
  2. Decision due12 August 2019
  3. Decision issued12 August 2019
  4. Grant issued18 September 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.