Planning Permission Ireland
GrantedInfrastructureDecided 6 August 2024

21 Charlemont Place, Dublin 2, D02 WV10

Removal of existing roof antennae and installation of two new antennae zones with up to 41 satellite dishes and antennae.

3846/24 · Dublin City Council · Lodged 12 June 2024

Reference
3846/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
12 June 2024

Summary

AI-generated

The applicant is seeking permission to replace the existing antennae array at roof level with two new antennae zones mounted on a flat roof frame. The cumulative area of these zones will not exceed 101 square metres, accommodating up to 41 satellite dishes and antennae in total.

Infrastructuretelecomsrooftopinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission is sought for the removal of the existing antennae array and replacement with 2 no. Antennae zones (a and b) at roof level, mounted on a flat roof frame, and all associated works. The maximum cumulative area of the antennae zones will not exceed 101 sq. M (with up to 41 no. Satellite dishes and antennae in total) . Antennae zone a will not exceed a maximum height of 2m, length of 15.5m and width of 8.6m. Antennae zone b will not exceed a maximum height of 2.5m, length of 5m and width of 2m.

Land-use zoning

What this land is zoned for

Z4: Key Urban Villages/Urban VillagesDC
To provide for and improve mixed-services facilities.

National zoning type: District, neighbourhood centre

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 27 September 2024.

Notified floor area: 101

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
27 Peter Place, Saint Kevin'S, Dublin 2Apr 2026€665,00062 m
9 Harcourt Terrace, Dublin 2Feb 2025€2,700,00063 m
2 Hilton Mews, Harcourt Terrace, Dublin 2Feb 2025€775,00066 m
2a Dartmouth Lodge, Dartmouth Place, RanelaghMar 2025€585,000109 m
165 Harcourt Green, Charlemont St, Dublin 2Mar 2025€115,500114 m
164 Faiche Fhearchair, Baile �tha Cliath 2Feb 2025€215,000114 m
165 Harcourt Green, Charlemont St, Dublin 2Mar 2025€183,333114 m
165 Harcourt Green, Charlemont St, Dublin 2Mar 2025€67,833114 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received12 June 2024
  2. Decision due6 August 2024
  3. Decision issued6 August 2024
  4. Permission expiry26 October 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.