GrantedCommercialDecided 13 December 2022

Site of former No. 2 Brewery, which incorporates the Brew Hall Building and connected Front Wing Building, and which is part of the existing Guinness Brewery lands to the South of James's Street, Dublin 8

Redevelopment of the former Guinness No. 2 Brewery into commercial offices and demolition of adjacent industrial structures.

4015/22 · Dublin City Council · Lodged 19 May 2022

Reference
4015/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
19 May 2022

Summary

AI-generated

The project involves repurposing the Brew Hall and Front Wing buildings into 16,413 sq.m of commercial offices. It also includes the demolition of the unused Brewhouse Water Tank, wet grain silos, and partial demolition of the former No. 3 Brewery.

Commercialofficedemolitionbreweryregeneration
Floor area
16,413 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development at a site of 0.7 ha at the former no. 2 brewery, which incorporates the brew hall building and connected front wing building, and which is part of the existing guinness brewery lands to the south of james's street, dublin
  • The site is bound by the open gate brewery to the north-west, former front offices (protected structures) along james's st to the north, st. James's church (a protected structure) and echlin street to the west, grand canal place to the south west and the guinness brewery site to the east and south. The development consists of the redevelopment and repurposing of the former no. 2 brewery to accommodate a commercial office, of c. 16,413 sq. M with associated facilities and the demolition of the adjacent unused former brewhouse water tank building, unused wet grain silos, which form part of the former guinness flavour extract plant 1 (known as gfe1), and partial demolition of former no. 3 brewery to the west and south of the no. 2 brewery building (total demolition of c. 12,923 sq. M). To facilitate the redevelopment of the buildings as commercial offices the following works are proposed: the height of the existing front wing building is extended by 2 no. Floors above the existing masonry enclosure in a modern pattern of framed openings, set back at the uppermost level increasing the existing building from a current height of 3 storeys plus mansard roof (c. 40.09m od) to 5 storeys (max height of c. 39.33m od). The height of the existing no. 2 brewery building is extended by 2 no. Floors above the existing masonry enclosure in a modern pattern of framed openings, set back at the uppermost level, level increasing the existing building from a current height of c. 5 storeys equivalent (c. 44.84m od) to 7 storeys (max height of c. 51.35m od). External roof terraces are provided at 3rd, 4th and 5th floor level on the southern elevation, 4th and 6th floor level on the northern elevation and 5th floor level on the eastern elevation. The existing buildings are retained and the external elevations are cleaned and refurbished in line with best conservation practice. The interior structure is replaced with a modern structure to support the proposed use of the building as a commercial office. The space is provided with a central top lit glazed atrium space, which rises from level 00 to roof level. The central atrium space features a new steel structure recreating the spirit and aesthetic of the original industrial structure. The interior elements for retention include the distinctive internal tiling to the inside face of external walls, the existing cast iron and jack arch construction of the front wing and the ground floor staircase of the front wing from level 00 to level 01 and the existing staircase of the front wing from level 00 to level 01 is proposed to be relocated to the base of the proposed atrium to link in with proposed levels. The roof of the brewhouse building is provided with a northlight profile plant screen which recreates the profile of the original existing structure at a higher level, screening roof mounted plant and forming a roof mounted photovoltaic array. The modern pastiche southern elevation of the front wing is removed and replaced with a modern metal clad façade which extends to the south, recreating the pattern of the existing façade in a striking contemporary material and aesthetic the modern party wall of the southern elevation of the no. 2 brewery is removed and replaced with a contemporary metal framed façade, providing shading and depth to this elevation. The core located to the south west is clad in a profiled precast concrete, which returns to the newly formed western elevation. The redundant industrial interior structures, roof structure (including the modern structure and finishes to the mansard of the admin building), redundant copper and modern finishes/ cladding elements are carefully removed. The intention is to retain the existing structural elements and copper structure for reuse in the site landscape scheme as part of a future masterplan application. Existing timber and metal windows are proposed to be retained and refurbished in line with best conservation practice. Externally the existing spiral stair to the north elevation is proposed to be retained and conserved in place and the ground level glazed openings are replaced with modern glazing and frames and an integrated metal lining is added to the proposed reception area entrance to demarcate the entrance zone. A new extended basement level with appropriate retention structures is formed to the building, expanding east and west from the existing part basement at a slightly lower level to accommodate staff changing facilities and plant rooms. The basement also contains space for future car parking space (currently in accessible under this plan which will be subject to future interconnection with wider masterplan basement). The guinness brewery lands contains protected structures, the proposed development does not comprise work to any protected structure

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 9, St James'S Court, Echnlin StreetMar 2026€280,000157 m
13 Block C Bellevue, Island Bridge, DublinAug 2025€415,000211 m
111 Apartments At, The Lock Keeper's Quay Block 6, Grand Canal Harbourprice excludes VATMar 2025€45,228,496244 m
Apt 38 Steevens Gate, 126 - 133 James Street, Dublin 8Feb 2025€545,000253 m
49 Steevens Gate, James St, Dublin 8Apr 2025€435,000255 m
1 St James Ave, Jamess St, Dublin 8not full market priceJun 2026€150,000259 m
32 Liberty View, Longs Place, Dublin 8Jan 2025€255,000273 m
Apt 26 Liberty View, Pim St, Dublin 8Mar 2025€170,000273 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received19 May 2022
  2. Decision due6 January 2023
  3. Decision issued13 December 2022
  4. Permission expiry18 March 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.